Home | Timetables | Bus routes | Operational details | Service changes | Operators & Garages | Photo gallery


Forthcoming planned service changes

Information correct to 7 May 2024
If this date is much more than a week old you are probably looking at an archived version.
Try clicking your browser's re-load button.

Click for a list of recent changes that have already taken place, or for a list of diversions (not necessarily complete).

New contracts will usually, but not always, mean new timetables, and often there will be other changes as well – details when known. New buses will now always be low floor and wheelchair accessible.

In line with the routes and details pages, new timetables (where available) are now accessed by clicking on the route number. Some may be PDF files for which Adobe Reader is required.

Where a ? is placed in the “Expected Date” column, there is now some doubt whether the change will take place at all. All dates and other information on this page are provisional and liable to be amended at short notice. Dates in italics are approximate. Note that night services are considered to be very early journeys on the following day's service, and hence the first few journeys of the revised service may actually operate on the previous evening.

Each time an item is added or amended, the current date will be added at the end of the text, in the format (DDMMYY). This can be used to help locating new information – use your browser's search page facility to check each recent date. Changes in the past 7 days are (highlighted on green). Changes in the last update are further (highlighted in red) and marked with a Ά.

All changes with even a vague date, such as vehicle type changes, have been assigned a nominal introduction date, which allows them to appear in a suitable place in the date index, rather than cluttering up the "undated" category. Only the month will be displayed in the list of changes.

Note: All pending changes are provisional and liable to be amended or cancelled without notice. Vehicle type changes are usually not tied to the exact date shown, and indeed are often phased in practice.

Official TfL information is available here: Bus Changes; real time travel information.

Updates within the past 7 days (Ά = last update, on 06/05/24)
Future: 6  52  120Ά  187  206  316Ά  390  419  485 
Past: 226  77  88  170  135Ά  148Ά 
Diversions: 9  12  22  23  24  27Ά  61  88  90  98  100  124  126  139  145  153  159  160  161  162  192  201  228  264  270  270  274  285  295  343  353  355  355  393Ά  395  423  452  453  624  D3  P12  R5  R5  R7  R10  R10  SL7  U5  N3  N9  N15  N18  N22  N27Ά  N97  N98  N109  N113  N136  N207  N343  N550 

Index to forthcoming changes by date
04/05/24-10/05/24: 22‡  24‡  27‡  29‡  60‡  64‡  109‡  134‡  198‡  250‡  289‡  343‡  S4‡  N22‡  N27‡  N29‡  N109‡  N250‡  N279‡  N343‡ 
11/05/24-17/05/24: 16  8698  110  120  206  316  321381419  481  485  632  E9  N86105‡  E6‡  R5‡  R10‡ 
18/05/24-24/05/24: 64113464  612N113N13325‡  274‡  328‡  354‡  C1‡  C3‡  N25‡  N31‡  N550‡ 
25/05/24-31/05/24: 6  52  108272  358390  396440  E1  E6  E11  P1227‡  49‡  90‡  98‡  285‡  393‡  395‡  423‡  SL7‡  N27‡  N98‡  N207‡ 
01/06/24-07/06/24: 187228245253  254  263297E3  26‡  394‡  N26‡ 
08/06/24-14/06/24: 639  670  R4‡ 
15/06/24-21/06/24: 487R68‡  S1‡ 
22/06/24-28/06/24: 120  143  260  302  R68  R70  147‡ 
29/06/24-05/07/24: 85  151211  328  406  465  C1  15‡  24‡  81‡  145‡  153‡  176‡  393‡  467‡  N15‡  N68‡ 
06/07/24-12/07/24: 65  71  281  371  681 
13/07/24-19/07/24: 382  127‡  152‡  201‡  264‡  270‡  280‡  355‡  S1‡  N44‡ 
20/07/24-26/07/24: 17  280  C11  W8 
27/07/24-02/08/24: 452‡ 
17/08/24-23/08/24: 243  W7 
24/08/24-30/08/24: 5  15  50  115  130  194  250  255  320  410 
31/08/24-06/09/24: 66  90  289  314  618  640  663  382‡ 
September 2024: 4  117  131  210  222  395  411  549  697  H13  W12  W13  W14  101‡  147‡  238‡  275‡  300‡  304‡  325‡  376‡  474‡  675‡ 
October 2024: 22  103  150  175  201  257  341  661  U1  U2  U3  U4  71‡  111‡  216‡  222‡  285‡  350‡  406‡  411‡  418‡  465‡  481‡  698‡  K1‡  U1‡  U3‡  U5‡ 
November 2024: 33  34  176  188  192  370  419  627  SL1  19‡  22‡  137‡  153‡  178‡  260‡  266‡  335‡  452‡  B16‡  C1‡  N19‡  N22‡  N137‡  N266‡ 
December 2024: 6  88  98  355  360  360‡  P4‡  N551‡ 
January 2025: 99  141  269  323  401  SL3  108‡  474‡  N551‡ 
February 2025: 36  343  W4 
March 2025 onward: 172  H22  H37  R1  R2  R3  R4  R8  R11  8‡  25‡  108‡  133‡  N8‡  N25‡  N242‡ 
Undated: 39  58  83  101  129  148157  206  207  214242  273  276  277  279  309  316  325  333  363  379  390439  444  689  D7  E1E2E8S3  SL4  SL8  W11  N242  N277  80†  80‡  93†  93‡  153†  153‡  154†  154‡  162†  162‡  163†  163‡  164†  164‡  201†  201‡  293†  293‡  413†  413‡  B15†  B15‡ 
* Denotes changes where the date is approximate or uncertain.
† Denotes the start of a temporary diversion, ‡ the end of such a diversion.

RouteDetailsExpected date
4Contract retained by Metroline with 17 new electric double deckers. (7 years) (250324)28 Sep 24
5Contract (including route N15) retained by Blue Triangle with 30 existing hybrid New Bus for London double deckers. (5 years) (290124)24 Aug 24
6Temporary timetable withdrawn and previous timetable reintroduced with daytime service restored to every 7-8 minutes Mondays to Saturdays, 10 minutes Sundays. (020524)
6Contract retained by Metroline with 18 existing hybrid double deckers. (3 years) (250324)7 Dec 24
15Contract retained by Blue Triangle with 14 existing hybrid New Bus for London double deckers. (5 years) (290124)24 Aug 24
16Temporary timetable introduced during railway works in Kilburn, with frequency reduced to every 11 minutes Monday to Saturday daytimes, 13 minutes evenings and Sundays, 16 minutes early mornings. (270424)11 May 24
17Contract retained by Metroline with 15 existing hybrid New Bus for London double deckers. (5 years) New timetable to reduce reliability. (270124)20 Jul 24
22Contract retained by London General with 18 new electric double deckers. (7 years) (250324)19 Oct 24
33Contract retained by London United with 18 new electric single deckers. (7 years) (170424)9 Nov 24
34Contract retained by Arriva London with 18 new electric double deckers. (7 years) (230224)9 Nov 24
36Contract retained by London Central with 29 existing hybrid double deckers. (5 years) (230224)8 Feb 25
39New electric single deckers introduced. (171123) 
50Contract retained by Arriva London with 15 new electric double deckers. (7 years) (231023)24 Aug 24
52Temporary timetable withdrawn and previous timetable reintroduced with daytime service restored to every 10 minutes Mondays to Saturdays, 12 minutes Sundays. (020524)
58New electric double deckers introduced. (020324) 
64New electric double deckers introduced. (190424)May 2024
65Contract retained by London United with existing electric double deckers. (3 years) (240424)6 Jul 24
66Contract retained by Arriva London with 14 existing hybrid double deckers. (6 years) (230224)31 Aug 24
71Contract retained by London United with 13 existing hybrid double deckers. (3 years) (170424)6 Jul 24
83New electric double deckers introduced. PVR changed to 19 [Additional vehicles used for operational purposes to be removed] (050923) 
85New timetable with reduced frequencies. PVR changed to 12. (250623)29 Jun 24
86New Streetdeck Electroliner electric double deckers introduced. (130424)May 2024
88Contract retained by London General with 22 new electric double deckers. (7 years) (250324)7 Dec 24
90Contract retained by Metroline with 17 new electric double deckers. New timetable to improve reliability. (7 years) (220224)31 Aug 24
98Temporary timetable introduced during railway works in Kilburn, with daytime service reduced to every 8-9 minutes Mondays to Saturdays, 11 minutes Sundays. (270424)11 May 24
98Contract retained by Metroline with 22 new electric double deckers (N98 will continue to use hybrids). (7 years) (250324)7 Dec 24
99Contract awarded to London Central with 14 new electric double deckers from Bexleyheath garage. (7 years) (250424)18 Jan 25
101New electric double deckers introduced. (020324) 
103Contract retained by Arriva London with 14 existing hybrid double deckers. (6 years) (230224)12 Oct 24
108Converted to D9UR 12m/Enviro200 MMC EV 2D single deckers (from route 507/521). (290324)May 2024
110Temporary timetable withdrawn and new timetable introduced to improve punctuality and with frequency restored to every 15 minutes Monday to Saturday daytimes, 20 minutes evenings and Sundays. (270424)11 May 24
113New electric double deckers introduced (260424)May 2024
115Contract retained by Blue Triangle with 15 existing hybrid double deckers. (6 years) (290124)24 Aug 24
117Contract retained by London United with 10 existing single deckers. (3 years) (250324)7 Sep 24
120Temporary timetable introduced during road works in Southall, with frequency reduced to every 9-10 minutes MF AM peak, 10 MF PM peak, 11 minutes Mon-Sat shopping hours, 13 minutes Sun shopping hours and every 16 minutes evenings. (060524)Ά11 May 24
120Contract retained by Metroline with 17 existing hybrid double deckers. (6 years) (030723)22 Jun 24
129Contract retained by Blue Triangle (transfer within Go Ahead London) with 22 new electric double deckers. (7 years) (201023)2025
130Contract retained by Transport UK with 12 existing single deckers. (6 years) (231023)24 Aug 24
131Contract retained by London General with 21 new electric double deckers. (7 years) (231023)28 Sep 24
141Contract retained by Arriva London with 28 new electric double deckers. (7 yers) (240424)11 Jan 25
143Contract retained by Metroline with 14 new electric single deckers. (7 years) (310723)22 Jun 24
148Restored to normal eastbound routeing via Terminus Place in Victoria. (261223)?
150Contract retained by Arriva London with 15 existing hybrid double deckers. (3 years) (250324)12 Oct 24
151New DD 10.9m/E400MMC EV electric double deckers introduced. (290324)Jun 2024
157New electric double deckers introduced. (301123) 
172Contract retained by London Central with 14 new electric double deckers. (7 years) (230224)15 Mar 25
175Contract retained by Arriva London with 14 existing hybrid double deckers. (3 years) (250324)12 Oct 24
176Contract retained by London Central with 22 existing hybrid New Bus for London double deckers. (5 years) (250324)9 Nov 24
187New Volvo BZL 10.2m/MCV single deckers introduced. (300424)Jun 2024
188Contract retained by London Central with 22 new electric double deckers. (7 years) (250324)9 Nov 24
192Contract retained by Arriva London with 15 existing single deckers. (3 years) (230224)9 Nov 24
194Contract retained by Arriva London with 14 new electric double deckers. (7 years) (231023)24 Aug 24
201Contract retained by Transport UK with 11 existing single deckers. (3 years) (231023)5 Oct 24
206Temporary timetable introduced during railway works in Kilburn, with frequency reduced to every 13 minutes Monday to Saturday daytimes (14-15 M-F PM peak), 21 minues early mornings (31 Sundays), evenings and Sundays. (010524)11 May 24
206New electric buses (mix of single and double deckers) introduced. (120424) 
207Withdrawn between Shepherd's Bush station and White City bus station. PVR changed to 28. (010419)?
210Contract retained by Metroline with 14 new electric double deckers. (7 years) (150823)21 Sep 24
211Contract awarded to Transport UK with 14 existing hybrid New Bus for London double deckers. (5 years) (050124)29 Jun 24
214Route restored to serve Liverpool Street Station. Normal timetable re-introduced. (110316)?
222Contract retained by Metroline with 17 existing hybrid double deckers. (3 years) (220224)14 Sep 24
228New Volvo BZL 10.8m/MCV electric single deckers introduced. (020324)Jun 2024
242New electric double deckers introduced. (220224) 
243Contract retained by Arriva London with 27 new electric double deckers. (7 years) (201023)17 Aug 24
245New electric double deckers introduced (ordered for E8 contract). (020324)Jun 2024
250Contract retained by Arriva London with 22 new electric double deckers, plus one bus from 689. (7 years) (231023)24 Aug 24
253Contract retained by Arriva London with 19 existing New Bus for London hybrid double deckers. (5 years) (310723)1 Jun 24
254Contract retained by Arriva London with 23 existing New Bus for London hybrid double deckers. (5 years) (310723)1 Jun 24
255Contract retained by Arriva London with 9 new electric single deckers. (7 years) (231023)24 Aug 24
257Contract retained by Stagecoach London with 16 new electric double deckers. (7 years) (230224)12 Oct 24
260Contract retained by Metroline with 17 existing hybrid double deckers. (3 years) (231023)22 Jun 24
263New electric double deckers introduced (ordered for E2 contract). (020324)Jun 2024
269Contract awarded to London Central with 13 new electric double deckers from Bexleyheath garage. (7 years) (250424)18 Jan 25
272Contract retained by London United with 9 existing single deckers. (6 years) (201023)25 May 24
273Re-routed in both directions via the northern part of Exford Road, instead of Senlac Road, Jevington Way and part of Winn Road. (040424) 
276New electric single deckers introduced. (150923) 
277New electric double deckers introduced. (220224) 
279New electric double deckers introduced. (141023) 
280Contract retained by London General with 14 new electric double deckers. (7 years) (231023)20 Jul 24
281Contract retained by London United with 21 existing electric double deckers. (3 years) (250324)6 Jul 24
289Contract retained by Arriva London with 15 new electric double deckers. (7 years) (231023)31 Aug 24
297New Streetdeck Electroliner electric double deckers introduced. (020324)Jun 2024
302Contract retained by Metroline with 16 existing hybrid double deckers. (3 years) (231023)22 Jun 24
309E20D 9.8m/Enviro200 MMC 2D single deckers introduced (from route W11). (230224) 
314Contract retained by Stagecoach London with 16 new electric single deckers. (7 years) (231023)31 Aug 24
316Temporary timetable introduced during railway works in Kilburn, with frequency reduced to every 9 minutes Monday to Saturday daytimes, 13 minutes evenings and Sundays, 16 minutes Mon-Sat early mornings, 21 minutes Sunday early mornings. Last bus from White City on Sundays will be 10 minutes earlier than normal. (060524)Ά11 May 24
316New electric single deckers introduced. (061023) 
320Contract retained by London General - Metrobus with 13 new electric double deckers. (7 years) (231023)24 Aug 24
321New electric double deckers introduced. (050424)May 2024
323Contract retained by Stagecoach London with 4 existing electric single deckers. (7 years) (220224)11 Jan 25
325New electric single deckers introduced. (020324) 
328Contract retained by Metroline with 19 existing hybrid double deckers. (3 years) (071123)29 Jun 24
333New electric double deckers introduced. (190124) 
341Contract retained by Arriva London with 19 new electric double deckers. (7 years) (170424)12 Oct 24
343Contract retained by London Central with existing hybrid double deckers. (5 years) (230224)1 Feb 25
355Contract retained by London General (transfer within Go Ahead London) with 13 new electric single deckers. (7 years) (250324)7 Dec 24
358New Irizar ie-Tram 12m electric single deckers introduced. (290324)May 2024?
360Contract retained by London Central with 11 new electric single deckers. (7 years) (250324)7 Dec 24
3636 new electric double deckers introduced. (091123) 
370Contract retained by Arriva London with 13 existing hybrid double deckers. (6 years) (230224)2 Nov 24
371Contract retained by London United with 14 existing electric single and double deckers. (3 years) (170424)6 Jul 24
379New electric single deckers introducd. (060324) 
381New electric double deckers introduced. (050424)May 2024
382Contract retained by Metroline with 9 new electric single deckers. (7 years) (150823)13 Jul 24
390Temporary timetable withdrawn and previous timetable reintroduced with daytime service restored to every 8-9 minutes Mondays to Saturdays, 10 minutes Sundays. (020524)
390Revised at Victoria Bus Station to start and finish in bay B. No change to the timetable. (261223)?
395Contract retained by London Sovereign with 5 existing single deckers. (3 years) (270124)7 Sep 24
396New electric single deckers introduced (260424)May 2024
401Contract awarded to London Central with 8 new electric double deckers from Bexleyheath garage. (7 years) (250424)18 Jan 25
406Contract (including 418) retained by London United with 14 existing hybrid double deckers. (3 years) (250324)29 Jun 24
410Contract retained by Arriva London with 18 existing single deckers. (6 years) (231023)24 Aug 24
411Contract retained by London United with 5 existing single deckers. (6 years) (221223)28 Sep 24
419Temporary timetable withdrawn and previous timetable reintroduced with Monday to Saturday daytime service restored to every 12 minutes. (020524)11 May 24
419Contract retained by London United with 12 existing single deckers. (3 years) (250324)9 Nov 24
439New electric single deckers introduced. (020324) 
440Contract retained by London United with 12 existing single deckers. (6 years) (201023)25 May 24
444Fully converted to D9UR 12m/Enviro200 MMC EV 2D single deckers (from route 507/521). (260124) 
464Contract retained by Transport UK with 3 existing single deckers. (6 years) (310723)18 May 24
465Contract awarded to Transport UK with 7 existing single deckers. (6 years) (221223)29 Jun 24
481Contract awarded to Metroline with 6 existing hybrid double deckers from Brentford garage. (3 years) Revised temporary timetable to improve reliability following introduction of 20mph speed limits along the route, with Monday to Friday peak hour frequency increased to every 30 minutes (plus PM school day trip), Monday to Saturday shopping hours restored to every 30 minutes and Sunday shopping hours restored to every 60 minutes. [Note: the school trips operated by Transport UK on the 111 contract are unaffected.] (270424)11 May 24
485Summer timetable commences. (010524)11 May 24
487New Volvo BZL 10.2m/MCV single deckers introduced. (260424)Jun 2024
549Renumbered W14 (see separate entry for details). Existing contract terminated. (160124)7 Sep 24
612New electric double deckers introduced. (260424)May 2024
618New school route. Contract awarded to Transport UK with 1 existing hybrid double decker. (3 years) (230224)31 Aug 24
627Contract retained by Arriva London with 3 existing hybrid double deckers. (6 years) (051223)2 Nov 24
632Temporary timetable introduced during railway works in Kilburn, with morning journey revised to start 5 minutes earlier. (270424)13 May 24
639Contract (including route 670) awarded to Transport UK with 2 existing hybrid double deckers. (3 years) (230224)8 Jun 24
640Contract awarded to Metroline with 2 existing hybrid double deckers from Harrow Weald garage. (3 years) (290124)31 Aug 24
661Contract retained by Stagecoach London with 1 existing double decker. (3 years) (051223)5 Oct 24
663Contract awarded to Arriva London with 1 new electric double decker. (7 years) (231023)31 Aug 24
670Operation transferred to Transport UK. (230224)10 Jun 24
681Contract retained by London United with 3 existing hybrid double deckers. (3 years) (250324)6 Jul 24
689New electric double decker introduced. (130424) 
697Contract awarded to Metroline with 3 existing double deckers from Uxbridge garage. (3 years) (190424)7 Sep 24
C1Contract retained by London United with 13 existing electric single deckers. (7 years) (071123)29 Jun 24
C11Contract retained by Metroline with 16 new electric single deckers. (7 years) (150823)20 Jul 24
D7New electric double deckers introduced. (301123) 
E1Contract awarded to Metroline with 7 existing double deckers from Greenford garage. New timetable to improve reliability following introduction of 20mph speed limits along the route. (3 years) (230224)25 May 24
E1Extended from Ealing to Osterley. PVR changed to 11. (170521) 
E2Electric double deckers introduced (from route 263)? (151022)2025?
E3Contract retained by London United with 20 existing hybrid double deckers. (3 years) (050124)1 Jun 24
E6Contract awarded to Abellio West London with 11 new electric single deckers from Dawley Road garage. (7 years) (040723)25 May 24
E8Electric double deckers introduced (from route 245)? (151022)2025?
E9Temporary Monday to Friday timetable withdrawn and previous timetable reintroduced with daytime service restored to every 12 minutes. (270424)13 May 24
E11Contract retained by Transport UK with 5 existing single deckers. (6 years) (030723)25 May 24
H13Contract retained by Metroline with 6 existing single deckers. (3 years) (220224)7 Sep 24
H22Contract retained by London United with 12 existing single deckers. (3 years) (190424)1 Mar 25
H37Contract retained by London United with 13 existing single deckers. (3 years) (170424)1 Mar 25
P12New D8UR 10.2m/Enviro200 MMCEV electric single deckers introduced. (290324)May 2024
R1Contract retained by London General - Metrobus with 6 new electric single deckers. (7 years) (120324)29 Mar 25
R2Contract retained by London General - Metrobus with 4 new electric single deckers. (7 years) (120324)29 Mar 25
R3Contract retained by London General - Metrobus with 6 new electric single deckers. (7 years) (120324)29 Mar 25
R4Contract retained by London General - Metrobus with 6 new electric single deckers. (7 years) (120324)29 Mar 25
R8Contract retained by London General - Metrobus with 2 new electric single deckers. (7 years) (120324)29 Mar 25
R11Contract retained by London General - Metrobus with 10 new electric single deckers. (7 years) (120324)29 Mar 25
R68Contract retained by Transport UK with 10 existing single deckers. (3 years) (231023)22 Jun 24
R70Contract retained by Transport UK with 11 new electric single deckers. (7 years) (231023)22 Jun 24
S3New electric single deckers introducd. (050424) 
SL1Contract retained by Arriva London with 11 new electric double deckers. (7 years) (230224)9 Nov 24
SL3Contract retained by Stagecoach London with 15 new electric double deckers. (7 years) (170424)18 Jan 25
SL4New express route between Grove Park and Canary Wharf via Silvertown Tunnel. Contract awarded to Blue Triangle with 18 new electric double deckers. (7 years) (201023)2025
SL8Withdrawn between Shepherd's Bush station and White City bus station. PVR changed to 19. (010419)?
U1Contract retained by Metroline with new electric single deckers. (7 years). (Note: route may be discontinued and replaced by changes to route U3.) (250324)26 Oct 24
U2Contract retained by Metroline with new electric single deckers. (7 years). (250324)26 Oct 24
U3Contract retained by Metroline with new electric double deckers. (7 years) (250324)26 Oct 24
U4Contract retained by Metroline with 12 new electric double deckers. (7 years) (051223)26 Oct 24
W4Contract retained by Arriva London with 14 existing single deckers. (5 years) (240424)1 Feb 25
W7Contract retained by Metroline with new electric double deckers. (7 years) (150823)17 Aug 24
W8Contract retained by Metroline with 15 new electric double deckers. (7 years) (150823)20 Jul 24
W11New electric single deckers introduced. (020324) 
W12Contract retained by Stagecoach London with 14 new electric single deckers. (7 years) Existing section between Wanstead and Whipps Cross discontinued and revised to operate from Woodford Bridge via current route W14 to Leytonstone, current route W19 to Whipps Cross Hospital and then on to Coppermill Lane. Also re-routed away from Walthamstow Village area to operate via Shernhall Street, Prospect Hill, Church Hill and Hoe Street. (160124)7 Sep 24
W13Contract retained by Stagecoach London with 8 new electric single deckers and 1 new electric double deck. (7 years) Allocation transferred to Lea Interchange garage. Extended from Leytonstone to Leyton Asda via current route W14. (160124)7 Sep 24
W14Existing route discontinued (See routes W12 and W13 for replacement service). New number for route 549, extended from South Woodford via current route W12 to Wanstead (Nightingale Lane), High Street (north), Hollybush Hill, Snaresbrook Road and Lea Bridge Road to Whipps Cross Bus Station. Contract retained by Stagecoach London with 2 new electric single deckers. (7 years) (160124)7 Sep 24
N86New Streetdeck Electroliner electric double deckers introduced. (130424)May 2024
N113New electric double deckers introduced (260424)May 2024
N133New Streetdeck Electroliner electric double deckers introduced. (260424)May 2024
N242New electric double deckers introduced (220224) 
N277New electric double deckers introduced (220224) 

Recent service changes

Changes to routes or timetables will be listed here for about 3 months after the event, or since the last issue of the Greater London Bus Map, whichever is longer. Late or amended items will be highlighted.

RouteDetailsDate
321Contract retained by London Central with 16 new electric double deckers. (7 years) New timetable incorporating withdrawal of the one Mon-Fri AM peak journey towards New Cross Gate and the PM school journey from Eltham Hill to New Cross Gate. Night service operation transferred to New Cross garage. (260424)2 December
246Temporary timetable withdrawn and previous timetable reintroduced with day frequency restored to every 30 minutes Mondays to Saturdays, 60 Sundays. (020124)30 December
6Temporary timetable introduced during road works at Hyde Park Corner, with daytime service reduced to every 8-9 minutes Mondays to Saturdays, 11 minutes Sundays. (050224)10 February
12Temporary timetable introduced during gas works on Charing Cross Road, with daytime and evening service reduced to every 13 minutes. (140224)10 February
14Temporary timetable introduced during road works at Hyde Park Corner, with service reduced to every 11 minutes Monday to Saturday daytimes, 13 minutes early evenings and Sunday daytimes. (140224)10 February
22Revised temporary timetable introduced during road works at Hyde Park Corner, with daytime frequency further reduced to every 11-12 minutes Saturdays and 13-14 minutes Sundays. (070224)10 February
24Temporary timetable introduced during diversion away from Charing Cross Road northbound, with frequency reduced to every 11 minutes Monday to Saturday daytimes, every 12 minutes Sunday daytimes and every 13 minutes daily evenings. (170224)10 February
52Temporary timetable introduced during road works at Hyde Park Corner, with daytime service reduced to every 11 minutes Mondays to Saturdays, 13 minutes Sundays. (040224)10 February
74Temporary timetable introduced during road works at Hyde Park Corner, with service reduced to every 11 minutes Monday to Saturday daytimes, 13 minutes early evenings and Sunday daytimes. (070224)10 February
87Temporary timetable introduced during road works on Charing Cross Road, with service reduced to every 8-9 minutes Monday to Saturday daytimes, 13 minutes evenings and Sundays. (070224)10 February
91Temporary timetable introduced during road works on Charing Cross Road, with service reduced to every 11 minutes (except late evenings). (070224)10 February
201New Monday to Friday timetable to improve reliability following introduction of 20mph speed limits and changes to road layouts along the route. PVR changed to 11. (060224)12 February
299New Monday to Friday and Sunday timetables to improve punctuality. (060224)11 February
390Temporary timetable introduced during road works at Hyde Park Corner, with daytime service reduced to every 9-10 minutes Mondays to Saturdays, 11 minutes Sundays. (040224)10 February
N22Temporary (?) Saturday night/Sunday morning timetable introduced with the first four journeys form Oxford Circus serving Putney 1 minute earlier (no other changes). (170224)11 February
120Temporary timetable withdrawn and previous timetable re-introduced, with frequency restored to every 8-9 minutes Mon-Fri AM peak, 9 mins PM peak, 10 mins Mon-Sat shopping hours, 11 mins Sun shopping hours and 15 mins evenings. (090224)17 February
189Re-routed via Brent Cross West Station, double running from Claremont Road via Parkview Avenue, Arbour Street and Interim Transport Interchange. New timetable. PVR changed to 16 day. (140224)17 February (0500)
EL1Contract retained by Blue Triangle with 18 existing hybrid New Bus for London double deckers. (5 years) (240523)17 February
EL2Contract retained by Blue Triangle with 14 existing hybrid New Bus for London double deckers. (5 years) (240523)17 February
EL3Contract retained by Blue Triangle with 14 existing hybrid New Bus for London double deckers. (5 years) (240523)17 February
U3New timetable with service revised to start 1 hour earlier in both directions. (140224)17 February
866 buses reallocated to Lea Interchange garage. New Saturday timetable and also minor changes on Monday to Friday evenings towards Romford. (260224)24 February
242Contract awarded to Stagecoach London with 14 double deckers from Ash Grove garage. (7 years) New timetable to improve punctuality. (220224)24 February
254Allocation transferred to Stamford Hill garage. No change to the timetable. (220224)24 February
277Contract retained by Stagecoach London with 15 double deckers. (7 years) New timetable to reduce reliability. (220224)24 February
283Contract retained by London United with 10 existing single deckers. (2 years) New timetable to improve punctuality and with Saturday and Sunday early morning service increased to every 15 minutes. Also, Sunday service revised to start earlier, at the same times as Mondays to Saturdays. (170224)24 February
SL3New express route between Thamesmead and Bromley. Calls at Thamesmead Town Centre, Boiler House, Abbey Wood Station, Abbey Road/Florence Road (towards Thamesmead), Bexleyheath Station, Lion Road, Bexleyheath Library, Sidcup Station, Sidcup Elm Road, Queen Mary's Hospital, Chislehurst War Memorial, Chislehurst Station, Bickley Station (Bickley Park Road), Bromley Baptist Church, Bromley Old Town Hall (towards Bromley) and Bromley North Station.Every 12 minutes Monday to Saturday daytimes, 15 minutes evenings and Sundays. Contract awarded to Stagecoach London with 15 New Bus for London hybrid double deckers (1 year to 17/1/25) from Bromley garage. (220224)24 February
N242Operation transferred to Stagecoach London from Ash Grove garage. New timetable to improve reliability with PVR changed to 5. (220224)24 February
N277New timetable to improve punctuality and with one trip fewer towards Crossharbour on all nights. (170224)24 February
5Temporary timetable introduced during cycling works in Romford, with daytime service reduced to every 7 minutes Monday to Friday peak hours, 8 Monday to Friday shopping hours, 7-8 minutes Saturdays, and 8-9 minutes Sundays. (280224)2 March
15Temporary timetable introduced during gas works on Charing Cross Road, with service reduced to every 11 minutes Saturday shopping hours and 13 minutes at other times. (280224)2 March
58Contract retained by Stagecoach London with 15 new electric double deckers. (7 years) New timetable to improve punctuality. (020324)2 March
80Part of allocation transferred to Goat Road garage. (230224)2 March
97Contract retained by Stagecoach London with 20 existing hybrid (?) double deckers. New timetable to improve punctuality, with the additional peak hour journeys withdrawn and evening service increased to every 12 minutes. (6 years) (280224)2 March
101Contract retained by Blue Triangle with 9 new electric double deckers. (7 years) New timetable to reduce reliability. (030324)2 March
153Following road layout changes, re-routed towards Finsbury Park via Liverpool Road instead of Palmer Place. (030324)2 March
159New timetable to improve reliability. (030324)2 March
166Re-routed between Purley and South Croydon via current route 405. New timetable to improve punctuality. (280224)2 March
215Contract retained by Stagecoach London with 5 existing hybrid New Bus for London double deckers. (5 years) New timteable to improve punctuality. (250224)2 March
225Temporarily withdrawn between Surrey Quays and Canada Water during works at Canada Water bus station. Last stop will be Surrey Quays Station and first stop Surrey Quays Shopping Centre. Temporary timetable introduced. (280224)2 March
238Contract retained by Stagecoach London with 12 existing hybrid double deckers. (6 years) Operation transferred to Barking garage. Temporary timetable introduced during gas works in East Ham, with daytime service reduced to every 12 minutes Mondays to Saturdays, 17 minutes Sundays. (030324)2 March
246Seasonal Sunday extension to Chartwell commences. Revised Sunday timetable with daytime service reduced to every 61-62 mins. (280224)3 March
309Contract retained by Stagecoach London with 9 existing single deckers. (6 years) New timetable to improve punctuality and with daily evening service increased to every 15 minutes. [Note: planned re-routeing away from Aberfeldy Estate is not taking place at this time.] (280224)2 March
312Extended from South Croydon via Brighton Road to Purley (partly replacing route 166), then via current route 455 (including the lap of Purley Cross/Purley Road) to Kenley. PVR changed to 1412. New timetable with last bus from Norwood Junction 15 minutes later. Converted to 10.2m E200Dart/Enviro200 single deckers from route 325; MetroCity electric buses withdrawn. (100324)2 March
325Contract awarded to Blue Triangle with 12 new electric existing 10.8m E200Dart and E20D single deckers from route 265 from River Road garage. (7 years) New timetable to improve punctuality and with the additional PM peak journey withdrawn. (020324)2 March
434Existing routeing between Purley and Whyteleafe South withdrawn (see route 439) and re-routed to Caterham via route 407. [Note: it is planned to re-route this route via Kenley, but delayed due to road infrastructure issues.] Buses will no longer operate in a loop at Rickman Hill, and start and finish journeys in Ridgemount Avenue. New timetable. PVR changed to 4. (280224)2 March
439New route from Whyteleafe South to Waddon Marsh via current route 434 to Purley, then route 289 to terminate in Trafalgar Way, departing via Drury Crescent. Every 30 minutes daily daytimes (35 mins Mon-Fri peak hours and weekend shopping hours) with no evening service. Contract awarded to Metrobus with D8UR 9.7m/Enviro200 MMC EV 2D electric single deckers from route 450, from Croydon garage. (7 years) (020324)2 March
455Discontinued. See route 312 for replacement between Reedham and Purley (and Croydon centre). See route 166 for replacement between Purley and South Croydon. See route S4 for replacement between Waddon Marsh and Roundshaw (and Wallington). No direct replacement between South Croydon and Waddon Marsh, or beween Roundshaw and Wallington; St Peter's Road in South Croydon will no longer by served by any buses. (230224)2 March
470Withdrawn between Epsom and Sutton Station. Buses will start and finish in The Quadrant. Also, re-routed between Sutton Common Road and Sutton Green via Marlborough Road, Dibdin Road, Stayton Road and Hallmead Road replacing route S3; route S3 follows the current 470 routeing. PVR changed to 4. (290224)2 March
650New timetable with morning journeys revised to run 5 minutes earlier throughout. (030324)4 March
656New timetable with morning journeys revised to run 5 minutes earlier throughout (TBC). (030324)4 March
C10Temporarily withdrawn between Surrey Quays Road and Canada Water during works at Canada Water bus station. Last stop will be at Surrey Quays Leisure Park and first stop at Surrey Quays Road/Canada Street departing via Surrey Quays Road, Lower Road and Redriff Road. Temporary timetable introduced with Monday to Saturday daytime service reduced to every 8-9 minutes (8 Mon-Fri AM peak). (290224)2 March
E6Temporary Monday to Friday timetable withdrawn and daytime service restored to every 12 minutes. Revised temporary timetable introduced daily with service withdrawn between Greenford Broadway and Greenford Station. No change to PVR. (230224)2 March
S1Operation transferred to Metrobus at Croydon garage, mostly with Metrocity 9.9m single deckers from route 455. (230224)2 March
S2New route replacing route 470 from Epsom to Sutton and then route S4 to St Helier Station. Daily, every 20 minutes Monday to Saturday daytimes, every 30 minutes evenings and Sundays. Contract awarded to London General with 8 new electric single deckers from Sutton garage. (7 years) (290224)2 March
S3Re-routed between Sutton Common Road and Sutton Green via Sutton Common Road and Angel Hill, replacing route 470; route 470 will serve the existing routeing. New timetable to reduce punctuality. (230224)2 March
S4Withdrawn beween Sutton and St Helier (see route S2 for replacement). Buses start and finish in Marshall's Road. Extended from Roundshaw to Waddon Marsh tram stop via current route 455. Frequency increased to every 20 minutes and a half hourly Sunday service introduced. PVR changed to 109 plus a bus from route 464. (100324)2 March
SL2New express route between North Woolwich and Walthamstow. Calls at Walthamstow Central Station, Walthamstow Market, Bell Corner (Forest Road eastbound, Hoe Street westbound), Forest Road/Wood Street, Southend Road/High Road (South Woodford), Woodford Avenue/Roding Lane North, Gants Hill Station (Cranbrook Raod, South side), Ilford Station, Ilford Broadway (southbound)/Sainsbury's (northbound), Barking Station, Barking London Road, Gallions Reach Station (Woolwich Manor Way), North Woolwich (Albert Road/Pier Road) and North Woolwich Free Ferry.Every 12 minutes Monday to Saturday daytimes, 15 minutes evenings and Sundays. Contract awarded to Arriva London with 16 existing E40H 10.2m/Enviro400H City 2D hybrid double deckers from route 133, from Barking garage. (2 years to 27/2/26) (250224)2 March
W11Contract retained by Stagecoach London with 9 new electric single deckers. (7 years) New timetable to improve punctuality. (250224)2 March
56New timetable to improve reliaiblity following changes to road layouts and introduction of 20mph speed limits along the route, with Monday to Friday PM peak frequency reduced to every 9 minutes. (060324)9 March
167Contract retained by Stagecoach London with 7 existing single deckers. (6 years) New timetable to improve punctuality. (050324)9 March
226New D8UR 10.8m/Enviro200 MMCEV electric single deckers introduced. (300424)March
346Extended from Upminster to Harold Hill (Dagnam Park Square) via route 347 to Harold Wood station than route 497. At Upminster Park Estate buses start and finish in Waycross Road at Lexington Way and no longer operate in a loop. At Upminster, buses no longer serve Station Approach. Frequency reduced to every 20 minutes daytimes and increased to every 20 minutes evenings. Sunday service introduced, every 20 minutes (Early mornings every 30 minutes). PVR changed to 6. (060324)9 March
379Contract awarded to Stagecoach London with 2 E20D 9.0m/Enviro200 1D single deckers borrowed from route 124 from Walthamstow Avenue garage. (7 years) New timetable. (030424)9 March
497Discontinued (see route 346). (060324)9 March
140New timetable to improve reliability. (130324)16 March
182New timetable to improve reliability. (130324)16 March
474Temporary timetable introduced during water works in East Ham, with daytime service reduced to every 14 minutes Mondays to Saturdays, 17 minutes Sundays. (200324)16 March
490Temporary timetable withdrawn and previous timetable reintroduced, with daytime service restored to every 12 minutes Mondays to Saturdays (9 to Richmond MF AM peak, 10 to Hearthrow MF PM peak), 20 minutes Sundays. (130324)16 March
R68Temporary timetable withdrawn and previous timetable reintroduced, with service restored to serve Richmond, Manor Circus and Kew Retail Park. PVR restored to 10. (150324)16 March
R70Temporary timetable withdrawn and previous timetable reintroduced, with service restored to serve Manor Road Homebase instead of Kew Retail Park, and daytime service restored to every 10 minutes Mondays to Saturdays, 15 minutes Sundays. PVR restored to 11. (150324)16 March
20Contract retained by Stagecoach London with 10 existing hybrid double deckers. (6 years) New Saturday and Sunday timetables to improve punctuality and with Saturday daytime service increased to every 15 minutes. (130324)23 March
76Contract awarded to Arriva London with 20 existing hybrid New Bus for London double deckers from Stamford Hill garage. (5 years) New timetable to reduce reliability. Night PVR changed to 4. (200324)23 March
101Temporary timetable introduced during water works in East Ham, with daytime service reduced to every 13-14 minutes Mondays to Saturdays, 16-17 minutes Sundays. (160324)23 March
147Temporary timetable introduced during water works in East Ham, with daytime service reduced to every 9 minutes Mondays to Saturdays, 11 minutes Sundays. (160324)23 March
186New timetable to improve punctuality. (130324)23 March
259Contract retained by Arriva London with 15 existing hybrid New Bus for London double deckers. (5 years) No change to the timetable. (200324)23 March
300Temporary timetable introduced during water works in East Ham, with daytime service reduced to every 16-17 minutes Mondays to Saturdays, 21-22 minutes Sundays. (190324)23 March
304Temporary timetable introduced during water works in East Ham, with daytime service reduced to every 14 minutes Mondays to Saturdays, 17 minutes Sundays. (190324)23 March
325Temporary timetable introduced during water works in East Ham, with daytime service reduced to every 13-14 minutes Mondays to Saturdays, 21-22 minutes Sundays. (190324)23 March
362Contract retained by Stagecoach London with 3 existing single deckers. (6 years) New timetable to improve punctuality and with substantial changes to times and minor adjustments to first and last bus times. (130324)23 March
376Temporary timetable introduced during water works in East Ham, with daytime service reduced to every 13-14 minutes Mondays to Saturdays, 31 minutes Sundays. (190324)23 March
393Contract retained by Metroline with 14 existing single deckers. (6 years) No change to the timetable. (130324)23 March
462Contract retained by Stagecoach London with 8 existing single deckers. (6 years) New timetable to improve punctuality. (130324)23 March
H98New timetable to improve reliability. PVR changed to 14. (220324)23 March
2Contract retained by Arriva London with 20 existing hybrid double deckers. (6 years) New timetable to reduce reliability. (270324)30 March
19Contract retained by Arriva London with 19 existing hybrid New Bus for London double deckers. (5 years) No change to the timetable. (270324)30 March
65Temporay timetable withdrawn and daytime service restored to every 6 minutes Mondays to Saturdays, 10 minutes Sundays. New timetable to improve reliability following introduction of 20mph speed limits along the route, with PVR changed to 30. (010424)30 March
97Operation transferred to Lea Interchange garage. No change to the timetable. (220324)30 March
113Contract retained by Metroline with 21 new electric double deckers. (7 years) No change to the timetable. (290324)30 March
195Temporary timetable withdrawn and previous timetable reintroduced with daytime service restored to every 12 minutes Mondays to Saturdays, 15 minutes Sundays. (220324)30 March
249Contract retained by Arriva London with 14 existing hybrid double deckers. (6 years) New timetable to reduce reliability. (270324)30 March
262Contract awarded to Blue Triangle with 10 new electric double deckers from Henley Road garage. (7 years) New timetable to improve punctuality. (220324)30 March
368Temporary Monday to Friday and Saturday timetable introduced during works at Movers Lane with daytime service reduced to every 13-14 minutes. (130424)30 March
396Contract retained by Blue Triangle with 4 new electric single deckers. (7 years) New timetable to improve punctuality. (220324)30 March
473Contract awarded to Blue Triangle (actually Docklands Buses) with 9 new electric double deckers from Henley Road Silvertown garage. (7 years) New timetable to improve punctuality. (010424)30 March
EL1Temporary timetable introduced during works at Movers Lane (full details TBC) (010424)30 March
EL2Temporary Monday to Friday timetable introduced during works at Movers Lane (full details TBC) (010424)30 March
EL3Temporary timetable introduced during works at Movers Lane (full details TBC) (010424)30 March
K1Temporary timetable for Tolworth works withdrawn and previous temporary timetable for Cromwell Road works reintroduced, with daytime service restored to every 10 minutes Mondays to Saturdays, 15 minutes Sundays. Postponed until 13 April (040424)30 March
N2New timetable. (270324)30 March
N65New timetable to improve punctuality following introduction of 20mph speed limits along the route. (010424)30 March
273Re-routed in both directions via the northern part of Exford Road, instead of Senlac Road, Jevington Way and part of Winn Road. Change postponed (120424)6 April
384New timetable to improve punctuality and coordinate with route 292. New Volvo BZL 9.6m/MCV single deckers introduced. PVR changed to 9. (050424)6 April
S3Contract awarded to Transport UK with 8 single deckers from Beddington garage. (7 years) New timetable to improve punctuality and with Mon-Fri peak hour frequency reduced to every 22 minutes. (130424)6 April
12Temporary timetable withdrawn and previous timetable reintroduced (TBC) with daytime and evening service restored to every 12 minutes. (120424)13 April
15Temporary timetable withdrawn and previous timetable reintroduced (TBC) with daytime and evening service restored to every 12 minutes (10 Saturday daytimes). (120424)13 April
24Temporary timetable withdrawn and previous timetable reintroduced (TBC) with Monday to Saturday daytime service restored to every 10 minutes (plus additional peak trip) and daily evenings to every 12 minutes. (120424)13 April
87Temporary timetable withdrawn and previous timetable reintroduced with service restored to every 7-8 minutes Monday to Saturday daytimes, 12 minutes evenings and Sundays. (120424)13 April
91Temporary timetable withdrawn and previous timetable reintroduced with daytime and evening service restored to every 10 minutes. (120424)13 April
115Temporary timetable introduced during works in East Ham, with daytime service reduced to every 9 minutes Mondays to Saturdays, 11 minutes Sundays. (120424)13 April
195Contract retained by Transport UK with 16 existing single deckers. (6 years) Temporary timetable reintroduced with daytime service reduced to every 13 minutes Mondays to Saturdays, 16 minutes Sundays. (030723)13 April
207Temporary timetable introduced during works on Ealing Road, with frequency reduced to every 6-7 minutes Monday to Saturday daytimes, 8-9 minutes evenings and Sundays. (160424)13 April
225Temporary timetable withdrawn and previous timetable reintroduced with buses restored to serve Canada Water station. (170424)13 April
306Contract awarded to Transport UK with 10 new Streetdeck Electroliner electric double deckers from Battersea garage. (7 years) New timetable to reduce reliability and with evening and Sunday afternoon service increased to every 15 minutes. (130424)13 April
627New timetable to improve punctuality, with morning journeys deaprting earlier and afternoon journeys departing later. [Believed to have been in operation informally since October] (120424)15 April
649The late journey from Campion School is withdrawn. PVR changed to 3. (180424)15 April
651Afternoon journey revised to run 5 minutes later throughout. (180424)15 April
689Contract retained by Arriva London with 1 double decker. New timetable to improve punctuality. (130424)13 April
C10Temporary timetable withdrawn and previous timetable reintroduced with buses restored to serve Canada Water station and Monday to Saturday daytime service restored to every 8 minutes (7-8 Mon-Fri AM peak). (170424)13 April
E3New timetable to improve reliability following introduction of 20mph speed limits along the route, with Mon-Fri PM peak service permanently reduced to every 10 minutes. (120424)13 April
K1Temporary timetable for Tolworth works withdrawn and previous temporary timetable for Cromwell Road works reintroduced, with daytime service restored to every 10 minutes Mondays to Saturdays, 15 minutes Sundays. (040424)13 April
K2Temporary timetable withdrawn and previous timetable reintroduced (TBC), with daytime service restored to every 10 minutes Mondays to Saturdays, 15 minutes Sundays. (120424)13 April
R68Temporary timetable introduced during works at Manor Circus, with daytime service reduced to every 17 minutes. (160424)13 April
R70Temporary timetable introduced during works at Manor Circus, with daytime service reduced to every 12 minutes Mondays to Saturdays, every 17 minutes Sundays. (160424)13 April
N137New Bus for London double deckers introduced. (260424)22 April
77Temporary timetable introduced during works at Lambeth Bridge, with daytime service reduced to every 11 minutes Mondays to Saturdays, 13 minutes Sundays. (300424)27 April
88Temporary timetable introduced during works at Lambeth Bridge, with daytime service reduced to every 11 minutes Mondays to Saturdays (9-10 MF AM peak), 13 minutes Sundays. (300424)27 April
110Contract retained by London United with existing single deckers. (6 years) No change to the temporary timetable. (200424)27 April
133New Streetdeck Electroliner electric double deckers introduced. (290324)April
206Contract retained by Metroline with 12 existing buses (mix of single and double deckers). (7 years) No change to the timetable. (120424)27 April
236Contract retained by Stagecoach London with 14 existing single deckers. (6 years) New timetable to improve punctuality and with Thur/Fri PM peak service restored to every 10 minutes. (260424)27 April
366Operation transferred to River Road garage. New timetable to improve punctuality. (240424)27 April
376Operation transferred to Blue Triangle from Henley Road garage. New D8UR 10.8m/Enviro200MMC EV 2D electric single deckers introduced. No change to the temporary timetable. (240424)27 April
394Contract retained by Stagecoach London with 10 existing single deckers. (6 years) (201023)27 April
482Operation transferred to Southall garage. No change to the timetable. (240424)27 April
D3New timetable to improve reliability. (240424)27 April
P4Contract awarded to London Central with 13 existing single deckers from New Cross garage. (6 years) Revised temporary timetable to improve punctuality. (240424)27 April
44Temporary timetable introduced during Chelsea Flower Show with service reduced to every 11 minutes Monday to Friday afternoons and Saturday shopping hours, and every 16 minutes Sunday shopping hours. (250424)29 April
170Temporary timetable introduced during Chelsea Flower Show with service reduced to every 11 minutes Monday to Friday afternoons and Saturday shopping hours, and every 13 minutes Sunday shopping hours. (300424)29 April
14Temporary timetable withdrawn and previous timetable reintroduced with service restored to every 10 minutes Monday to Saturday daytimes, 12 minutes evenings and Sundays. (270424)4 May
22Temporary timetable for Hyde Park Corner works withdrawn and previous temporary timetable reintroduced with daytime service restored to every 11 minutes Monday to Saturday shopping hours, 11-12 minutes Mon-Fri PM peak, and every 13 minutes Sundays. (270424)4 May
23Temporary timetable for Winter Wonderland withdrawn and previous timetable reintroduced with afternoon and early evening service restored to every 12 minutes. (270424)4 May
28Contract awarded to Metroline with 19 existing double deckers from Willesden Junction garage. (3 years) New timetable to improve reliability following introduction of 20mph speed limits along the route. (270424)4 May
31Allocation transferred to Holloway garage. No change to the timetable. (200424)4 May
74Temporary timetable withdrawn and previous timetable reintroduced with service restored to every 10 minutes Monday to Saturday daytimes, 12 minutes evenings and Sundays. (270424)4 May
135New timetable to improve reliability. (060524)Ά4 May
148Temporary timetable withdrawn and new timetable introduced to improve punctuality, with frequency restored to every 10 minutes Monday to Saturday daytimes, 12 minutes evenings and Sundays. (060524)Ά4 May
152New D8UR 10.2m/Enviro200 MMCEV electric single deckers introduced. (190424)May
226Temporary timetable withdrawn and previous timetable reintroduced with daytime service restored to every 12 minutes Mondays to Saturdays (with additional peak trips), 20 minutes Sundays. (260424)4 May
452Temporary timetable for Winter Wonderland withdrawn and previous temporary timetable reintroduced with afternoon and early evening service restored to every 12 minutes. (270424)4 May
483Temporary timetable introduced during works on Uxbridge Road, with daytime service reduced to every 11 minutes Mondays to Saturdays, 13 minutes Sundays. (270424)4 May
N28Operation transferred to Metroline at Willesden Junction garage. New timetable to improve punctuality and improve coordination with route N31. (270424)4 May

Diversions

Diversions will be listed here until 4 weeks after they finish. All future dates are estimates, and may be amended without notice. Past dates are not guaranteed to be accurate. Current diversions, and all future dates, are highlighted in red.

This list should not be taken as definitive, but is intended to give the scope of major diversions. Not all diversions are notified, and diversions of less than 72 hours' duration are not normally included unless of very long physical length. Always check the TfL website for possible disruptions to time-critical journeys.

Official TfL information is available here: Bus Changes.

Where diversions are listed as being in both directions, buses in the opposite direction traverse the streets in reverse order to that listed, with any variations as noted. If buses traverse the streets in the same order both ways (e.g. on loop workings) then both termini will be listed separately.
RouteDetailsStart dateEnd date
1Owing to water works in Eversholt Street (Camden), temporarily diverted towards Hampstead Heath via Lidlington Place and Hampstead Road, and towards Canada Water via Crowndale Road, Pancras Road, Midland Road and Euston Road. (170424)13 November 23 (0800)24 April 24 (1830)
1Owing to capacity and drainage works in Canada Water Bus Station, temporarily revised to end journeys at Surrey Quays Station (Rotherhithe Old Road) and start from Surrey Quays Shopping Centre. (170424)2 March 24 (0500)13 April 24 (0500)
1Owing to a gas leak on Eversholt Street (Euston), temporarily diverted towards Hampstead Heath via Euston Road, Gowr Street, Grafton Way, Tottenham Court Road and Hampstead Road. (170424)9 April 24 (1200)19 April 24 (1800)
1Owing to water works in Eversholt Street (Camden), temporarily diverted towards towards Canada Water via Crowndale Road, Pancras Road, Midland Road and Euston Road. (250424)24 April 24 (1830)30 April 24 (1800)
5Owing to cycling works in Eastern Road (Romford), temporarily diverted towards Romford via Victoria Road and Mercury Gardens. (220324)19 March 24 (1000)19 April 24 (1800)
8Owing to building works in Angel Street, temporarily diverted towards Bow via King Edward Street, Little Britain, Montague Street and Aldersgate Street. (090223)12 June 23 (1200)31 March 25 (1800)
9Owing to a gas leak on Cockspur Street (Trafalgar Square), temporarily withdrawn between Piccadilly Circus and Aldwych. (030524)1 May 24 (1000)5 May 24 (1800)
12Owing to a gas leak on Cockspur Street (Trafalgar Square), temporarily withdrawn between Parliament Square and Oxford Circus. (030524)1 May 24 (1000)5 May 24 (1800)
15Owing to poor road design, temporarily (?) diverted towards Blackwall via Goodman's Yard and Mansell Street, instead of Minories, Aldgate Bus Station and Aldgate High Street. (080424)4 May 16 (1500)1 July 24 (0000)
16Owing to water works on Shoot-Up Hill, temporarily diverted in both directions via Chichele Road, Walm Lane and Willesden Lane. (250424)29 April 24 (0800)4 May 24 (1800)
19Owing to utility works in Sloane Street, temporarily diverted northbound via Sloane Square, Cliveden Place, Eaton Gate, Eaton Square, Hobart Place and Grosvenor Place. (080124)7 January 23 (2100)29 November 24 (1800)
22Owing to utility works in Sloane Street, temporarily diverted northbound via Sloane Square, Cliveden Place, Eaton Gate, Eaton Square, Hobart Place and Grosvenor Place. (080124)7 January 23 (2100)29 November 24 (1800)
22Owing to telecommunications works in Piccadilly, temporarily diverted towards Putney Common via Regent Street, Piccadilly Circus, Haymarket, Charles II Street, Regent Street and Piccadilly. (030524)6 May 24 (0800)9 May 24 (1800)
23Owing to a gas leak on Cockspur Street (Trafalgar Square), temporarily withdrawn between Piccadilly Circus and Aldwych. (030524)1 May 24 (1000)5 May 24 (1800)
24Owing to water works in Wilton Road, temporarily diverted in both directions via Gillingham Street and Belgrave Road. (300424)3 January 24 (0000)2 July 24 (2359)
24Owing to an electrica fault in Hampstead Road (Mornington Crescent), temporarily diverted southbound via Eversholt Street, Lidlington Place and Harrington Square. (250424)17 April 24 (1500)8 May 24 (1800)
24Owing to a water leak on Tottenham Court Road, temporarily diverted southbound via Euston Road slip road, Gower Street and Grafton Way. (260424)24 April 24 (0900)30 April 24 (1800)
25Owing to building works in Angel Street, temporarily diverted towards Ilford via King Edward Street, Little Britain, Montague Street and Aldersgate Street. (140223)12 June 23 (1200)31 March 25 (1800)
25Owing to a fire at Forest Gate Police Station, temporarily diverted in both directions via Forest Drive, Aldersbrook Road, Centre Road and Woodgrange Road. (170424)10 March 24 (0900)19 April 24 (1800)
25Owing to gas works in Leadenhall Street (City), temporarily diverted westbound via Middlesex Street, St Botolph Street, Dukes Place, Bevis Marks, Camomile Street and Bishopgate, and eastbound via Lombard Street, King William Street, Gracechurch Street and Fenchurch Street. (080424)8 April 24 (0700)20 May 24 (2000)
26Temporarily revised to finish journeys in Victoria at Westminster Cathedral, instead of Terminus Place. (120424)29 July 23 (0800)1 June 24 (0000)
27Owing to development works at Chalk Farm Morrisons, temporarily revised to start and finish journeys in Chalk Farm Road at Harmood Street. (060524)Ά10 July 21 (0000)31 May 24 (2359)
27Owing to a gas leak in Chapel Street (Marylebone), temporarily diverted eastbound via Edgware Road, Harrow Road (double run to Bishop's Bridge Road) and Marylebone Road. (170424)15 April 24 (1200)20 April 24 (1200)
27Owing to an electrica fault in Hampstead Road (Mornington Crescent), temporarily diverted southbound via Eversholt Street, Lidlington Place and Harrington Square. (250424)17 April 24 (1500)8 May 24 (1800)
29Owing to an electrica fault in Hampstead Road (Mornington Crescent), temporarily diverted southbound via Eversholt Street, Lidlington Place and Harrington Square. (250424)17 April 24 (1500)8 May 24 (1800)
29Owing to a water leak on Tottenham Court Road, temporarily diverted southbound via Euston Road slip road, Gower Street and Grafton Way. (260424)24 April 24 (0900)30 April 24 (1800)
32Owing to water works on Shoot-Up Hill, temporarily diverted in both directions via Chichele Road, Walm Lane and Willesden Lane. (250424)29 April 24 (0800)4 May 24 (1800)
47Owing to capacity and drainage works in Canada Water Bus Station, temporarily diverted in both directions direct via Surrey Quays Road. (170424)2 March 24 (0500)13 April 24 (0500)
49Owing to road works in Stanhope Gardens (South Kensington), temporarily diverted towards White City via Queens Gate, Queens Gate Plce and Queens Gate Gardens, and towards Clapham Junction via Cromwell Road and Queensberry Place. (050424)6 April 24 (0730)8 April 24 (1600)
49Owing to road works in Stanhope Gardens (South Kensington), temporarily diverted towards Clapham Junction via Cromwell Road and Queensberry Place. (000100)8 April 24 (1600)31 May 24 (1800)
54Owing to a gas leak in Beckenham Hill Road, temporarily diverted towards Elmers End via Southend Lane and Blacklands Road. (190424)18 April 24 (2100)25 April 24 (1900)
58Owing to a fire at Forest Gate Police Station, temporarily diverted in both directions via Upton Lane and Plashet Road. (170424)10 March 24 (0900)19 April 24 (1800)
60Owing to a water leak in Poplar Walk (West Croydon), temporarily diverted southbound via St James's Road, Hogarth Crescent, Whitehorse Road, St James's Road, Newgate and Wellesley Road. (200424)22 April 24 (0800)10 May 24 (1500)
61Owing to cosmetic works in Loop Road (Chislehurst), temporarily diverted towards Bromley via Heathfield Lane. (300424)4 April 24 (1626)2 May 24 (1600)
61Owing to water works in Widmore Road (Bromley), temporarily diverted towards Bromley North Station direct via Tweedy Road. (030424)3 April 24 (0800)14 April 24 (1800)
64Owing to track works in Dingwall Road, temporarily diverted southbound via Wellesley Road and George Street. (020424)29 March 24 (0100)25 April 24 (0500)
64Owing to a water leak in Poplar Walk (West Croydon), temporarily diverted southbound via St James's Road, Hogarth Crescent, Whitehorse Road, St James's Road, Newgate and Wellesley Road. (200424)22 April 24 (0800)10 May 24 (1500)
66Owing to cycling works in Eastern Road (Romford), temporarily diverted towards Leytonstone via South Street, Victoria Road and Mercury Gardens. (220324)19 March 24 (1000)19 April 24 (1800)
71Owing to rebuilding of Cromwell Road Bus Station, temporarily revised to finish journeys in Eden Street and start from Cromwell Road. (120324)28 August 23 (1000)31 October 24 (2359)
73Owing to telecommunications works in Albion Road (Stoke Newington), temporarily diverted in both directions via Stoke Newington Church Street (west) and Green Lanes. (200424)22 April 24 (0800)3 May 24 (1800)
73Owing to a water leak on Tottenham Court Road, temporarily diverted southbound via Gower Street and Grafton Way. (260424)24 April 24 (0900)30 April 24 (1800)
80Owing to road works in Crown Lane (Morden), temporarily diverted towards Hackbridge via Central Road, Morden Hall Road, Aberconway Road and London Road to Morden Station. [POSTPONED] (110823)  
81Owing to a fire at Slough Bus Station, temporarily revised to start and finish journeys in Wellington Streert westbound, departing direct to Windsor Road. (170424)31 October 22 (0500)30 June 24 (1700)
81Owing to road works in Bell Road (Hounslow), temporarily diverted westbound via Grove Road, Staines Road and Hospital Road. (260424)15 April 24 (0800)29 April 24 (1400)
86Owing to a fire at Forest Gate Police Station, temporarily diverted in both directions via Forest Drive, Aldersbrook Road, Centre Road and Woodgrange Road. (170424)10 March 24 (0900)19 April 24 (1800)
86Owing to cycling works in Eastern Road (Romford), temporarily diverted towards Stratford via South Street, Victoria Road and Mercury Gardens. (220324)19 March 24 (1000)19 April 24 (1800)
88Owing to a gas leak on Cockspur Street (Trafalgar Square), temporarily diverted northbound via Trafalgar Square (East), St Martin's Place, Charing Cross Road, Shaftesbury Avenue, Grest Windmill Street, Haymarket and Charles II Street. (300424)1 May 24 (1000)5 May 24 (1800)
90Owing to utility works in Envoy Avenue (Hatton Cross), temporarily diverted towards Feltham via Eastern Perimeter Road. (300424)10 October 23 (1500)29 May 24 (2359)
93Owing to road works in Crown Lane (Morden), temporarily diverted towards Putney via Central Road, Morden Hall Road, Aberconway Road and London Road to Morden Station. [POSTPONED] (110823)  
97Owing to cosmetic works in Westfield Avenue, temporairly diverted towards Chingford via Montfitchet Road (north) and International Way. (260124)24 January 24 (1234)12 April 24 (1800)
98Owing to cycling works in Procter Street, temporarily revised to end journeys in Bloomsbury Way and start from New Oxford Street. (030524)18 January 24 (1700)31 May 24 (1700)
100Owing to water works in Cable Street (Shadwell), temporarily diverted towards Shadwell via The Highway, Butcher Row, Commercial Road and Sutton Street. (300424)1 May 24 (0900)3 May 24 (2300)
101Owing to water works in High Street North (East Ham), temporarily diverted northbound via Barking Road and Ron Leighton Way. (140324)4 March 24 (0800)30 September 24 (1800)
103Owing to cycling works in Eastern Road (Romford), temporarily diverted towards Chase Cross via Victoria Road and Mercury Gardens. (220324)19 March 24 (1000)19 April 24 (1800)
105Owing to gas works in Oldfield Lane North, temporarily revised to end journeys in Greenford Road and start from Oldfield Lane North. (030324)3 March 24 (1900)12 May 24 (2000)
108Owing to building works at Stratford International, temporarily revised to end journeys in Celebration Avenue arriving via Montfichet Road and Penny Brookes Street, and start from International Way east of Celebration Avenue. (210122)4 January 22 (0000)3 October 25 (0000)
108Owing to bridge works in Tunnel Avenue, temporarily diverted towards Stratford direct via Blackwall Tunnel Southern Approach (after serving North Greenwich). (130723)20 June 23 (0600)17 January 25 (1700)
109Owing to a water leak in Poplar Walk (West Croydon), temporarily diverted southbound via St James's Road, Hogarth Crescent, Whitehorse Road, St James's Road, Newgate and Wellesley Road. (200424)22 April 24 (0800)10 May 24 (1500)
110Owing to bridge works at Manor Circus, temporarily diverted towards Hounslow direct via Kew Road. (160324)22 September 23 (2200)8 April 24 (0500)
110Owing to water works in Chiswick High Road, temporarily diverted towards Hammersmith via Great West Road, Sutton Court Road, Heathfield Terrace, Wellesley Road and Oxford Road North. (010424)2 April 24 (0600)9 April 24 (1800)
111Owing to rebuilding of Cromwell Road Bus Station, temporarily revised to finish journeys at Kingston Church and start from Kingston Station. (120324)28 August 23 (1000)31 October 24 (2359)
119Owing to water works in Widmore Road (Bromley), temporarily diverted towards Bromley North Station direct via Tweedy Road. (030424)3 April 24 (0800)14 April 24 (1800)
120Owing to road works in Bell Road (Hounslow), temporarily diverted towards Northolt via Grove Road, Staines Road, Hospital Road and Bath Road. (260424)15 April 24 (0800)29 April 24 (1400)
122Owing to water works in Eltham Road (Kidbrooke), temporarily diverted towards Plumstead via Sidcup Road and Westhorne Avenue. (250324)28 March 24 (2200)14 April 24 (1700)
124Owing to a water leak in Court Road (Mottingham), temporarily diverted in both directions via Middle Park Avenue (north arm), Westhorne Avenue and Sidcup Road. (010524)25 April 24 (1000)7 May 24 (1800)
125Owing to water works on Church Road (Hendon), temporarily diverted in both directions via Brent Street, Queens Road, Watford Way and The Burroughs. (040424)3 April 24 (0800)9 April 24 (1900)
126Owing to water works in Widmore Road (Bromley), temporarily diverted northbound direct via Tweedy Road. (030424)3 April 24 (0800)14 April 24 (1800)
126Owing to a water leak in Court Road (Mottingham), temporarily diverted in both directions via Eltham Hill, Westhorne Avenue and Sidcup Road. (010524)25 April 24 (1000)7 May 24 (1800)
127Owing to gas works in London Road (Mitcham), temporarily diverted towards Tooting via Raleigh Gardens, Upper Green West, Upper Green East, Commonside East, Cedars Avenue, Tamworth Lane, Eastfield Road and Locks Lane. (220424)22 April 24 (0000)14 July 24 (2350)
128Owing to cycling works in Eastern Road (Romford), temporarily diverted towards Claybury via South Street, Victoria Road and Mercury Gardens. (220324)19 March 24 (1000)19 April 24 (1800)
133Owing to building works in Angel Street, temporarily diverted towards Streatham via King Edward Street, Little Britain, Montague Street and Aldersgate Street. (170423)29 April 23 (0200)31 March 25 (1800)
134Owing to an electrica fault in Hampstead Road (Mornington Crescent), temporarily diverted southbound via Eversholt Street, Lidlington Place and Harrington Square. (250424)17 April 24 (1500)8 May 24 (1800)
137Owing to utility works in Sloane Street, temporarily diverted northbound via Sloane Square, Cliveden Place, Eaton Gate, Eaton Square, Hobart Place and Grosvenor Place. (080124)7 January 23 (2100)29 November 24 (1800)
138Owing to water works in Widmore Road (Bromley), temporarily diverted towards Bromley North Station direct via Tweedy Road. (030424)3 April 24 (0800)14 April 24 (1800)
139Owing to a gas leak on Cockspur Street (Trafalgar Square), temporarily diverted northbound via Trafalgar Square (East), St Martin's Place, Charing Cross Road, Shaftesbury Avenue, Grest Windmill Street, Haymarket and Charles II Street. (300424)1 May 24 (1000)5 May 24 (1800)
143Owing to water works on Church Road (Hendon), temporarily diverted in both directions via Brent Street and Queens Road. (040424)3 April 24 (0800)9 April 24 (1900)
145Owing to closure of Messina Way (Dagenham), temporarily diverted in both directions via Merrielands Crescent. (030524)9 February 24 (0800)30 June 24 (1900)
146Owing to water works in Widmore Road (Bromley), temporarily diverted towards Bromley North Station direct via Tweedy Road. (030424)3 April 24 (0800)14 April 24 (1800)
147Owing to water works in Silvertown Way, temporarily diverted in both directions via Canning Town Bus Station, northern exit, Canning Town roundabout (southbound) and Silvertown Way. [Diversion lifted 24/05 06:00-27/05 0:01] (260424)29 April 24 (0600)23 June 24 (0001)
147Owing to water works in High Street North (East Ham), temporarily diverted northbound via Ron Leighton Way. (140324)4 March 24 (0800)30 September 24 (1800)
152Owing to gas works in London Road (Mitcham), temporarily diverted towards Pollards Hill via Upper Green East, Commonside East, Cedars Avenue and Tamworth Lane. (190424)22 April 24 (0000)14 July 24 (2350)
153Owing to a gas leak in Beech Street, temporarily diverted towards Finsbury Park via London Wall and Aldersgate Street. [End date TBC!] (030124)4 January 24 (0900)25 November 24 (1630)
153Owing to water works in Blomfield Street (Moorgate), temporarily diverted towards Liverpool Street Station via Aldersgate Street and London Wall. [CANCELLED] (120124)  
153Owing to electrical works in Eldon Street (Moorgate), temporarily diverted towards Liverpool Street Station via Aldersgate Street and London Wall. (010524)7 May 24 (0700)29 June 24 (2000)
154Owing to road works in Crown Lane (Morden), temporarily diverted towards Morden via Central Road, Morden Hall Road, Aberconway Road and London Road. [POSTPONED] (110823)  
159Owing to a gas leak on Cockspur Street (Trafalgar Square), temporarily diverted northbound via Trafalgar Square (East), St Martin's Place, Charing Cross Road, Shaftesbury Avenue, Grest Windmill Street, Haymarket and Charles II Street. (300424)1 May 24 (1000)5 May 24 (1800)
160Owing to cosmetic works in Loop Road (Chislehurst), temporarily diverted towards Sidcup via Heathfield Lane. (300424)4 April 24 (1626)2 May 24 (1600)
161Owing to a water leak in Court Road (Mottingham), temporarily diverted in both directions via Eltham Hill, Westhorne Avenue and Sidcup Road. (010524)25 April 24 (1000)7 May 24 (1800)
162Owing to water works in Slades Drive (north Chislehurst), temporarily diverted in both directions direct via Edgbury. [POSTPONED UNTIL 2023] (181022)  
162Owing to gas works in Wickham Way (Park Langley), temporarily diverted in both directions via Scotts Lane, Oakwood Avenue and Overbury Avenue. (010424)2 April 24 (0800)14 April 24 (1700)
162Owing to cosmetic works in Loop Road (Chislehurst), temporarily diverted towards Beckenham via Heathfield Lane. (300424)2 April 24 (0800)2 May 24 (1600)
163Owing to road works in Crown Lane (Morden), temporarily diverted towards Morden via Tudor Drive (double run from Hillcross Avenue roundabout), Epsom Road, Central Road, Morden Hall Road, Aberconway Road and London Road. [POSTPONED] (110823)  
164Owing to road works in Crown Lane (Morden), temporarily diverted towards Sutton via Links Avenue, Hillcross Avenue, Tudor Drive, Epsom Road, Central Road, Morden Hall Road, Abeconway Road and London Road to Morden Station. [POSTPONED] (110823)  
165Owing to cycling works in Eastern Road (Romford), temporarily diverted towards Romford via Victoria Road and Mercury Gardens. (220324)19 March 24 (1000)19 April 24 (1800)
165Owing to zebra crossing installation in Rosewood Avenue (Mungo Park), temporarily diverted in both directions via Wood Lane, Upper Rainham Road, Elm Park Avenue and The Broadway (double run to Rosewood Avenue). (080424)8 April 24 (0900)19 April 24 (1700)
166Owing to gas works in College Road (Epsom), temporarily diverted in both directions via Church Street, Downs Road and Grandstand Road. (010424)29 March 24 (0800)20 April 24 (1600)
167Owing to a water leak in Station Road (Chigwell), temporarily diverted in both directions direct via Hainault Road. (260424)25 April 24 (0900)29 April 24 (1700)
170Owing to a water leak in Plough Road (Clapham Junction), temporarily diverted towards Roehampton via York Road and Falcon Road. (040424)4 April 24 (1000)8 April 24 (1800)
174Owing to cycling works in Eastern Road (Romford), temporarily diverted towards Harold Hill via Victoria Road and Mercury Gardens. (220324)19 March 24 (1000)19 April 24 (1800)
175Owing to cycling works in Eastern Road (Romford), temporarily diverted towards Hillrise Estate via Victoria Road and Mercury Gardens. (220324)19 March 24 (1000)19 April 24 (1800)
176Owing to building works in St Giles High Street, temporarily (?) revised to finish journeys in Great Russell Street via Tottenham Court Road. [Diversion originally started 02/12/15 04:30] (080424)10 March 24 (0000)1 July 24 (0600)
176Owing to a gas leak in Penge High Street, temporarily diverted in both directions via Green Lane, Parish Lane, Lennard Road, Newlands Park and Sydenham Road. (030424)3 April 24 (1300)10 April 24 (1800)
178Owing to road works in Tudway Road, temporarily diverted from Ryan Close via Ottley Drive to Tudway Road. (020424)2 April 24 (0800)18 November 24 (1800)
180Owing to a water leak in West Street (Erith), temporarily diverted towards North Greenwich via Bronze Age Way and Lower Road, and towarsd Erith via Bronze Age Way and Walnut Tree Road. (260424)24 April 24 (1430)1 May 24 (1900)
183Owing to water works on Church Road (Hendon), temporarily diverted in both directions via Vivian Avenue and Queens Road. (040424)3 April 24 (0800)9 April 24 (1900)
187Owing to electrical works on North Acton Road (Park Royal), temporarily diverted towards Central Middlesex Hospital direct via Acton Lane. (050224)5 February 24 (0800)12 April 24 (1800)
188Owing to capacity and drainage works in Canada Water Bus Station, temporarily diverted in both directions direct via Surrey Quays Road. (170424)2 March 24 (0500)13 April 24 (0500)
189Owing to water works on Shoot-Up Hill, temporarily diverted in both directions via Chichele Road, Walm Lane and Willesden Lane. (250424)29 April 24 (0800)4 May 24 (1800)
192Owing to an even in Town Road (Edmonton), temporarily diverted in both directions via St Martins Road, Monmouth Road, Hertford Road, Bounces Road and Montagu Road. (300424)3 May 24 (1000)6 May 24 (0400)
193Owing to cycling works in Eastern Road (Romford), temporarily diverted towards Queens Hospital via Victoria Road and Mercury Gardens. (220324)19 March 24 (1000)19 April 24 (1800)
194Owing to water works in Shirley Way (Shirley), temporarily diverted in both directions via Bridle Road (inc the usual double run) and Wickham Road. (010424)2 April 24 (0800)8 April 24 (2000)
194Owing to track works in Dingwall Road, temporarily diverted southbound via Wellesley Road and George Street. (020424)29 March 24 (0100)25 April 24 (0500)
197Owing to a gas leak in Penge High Street, temporarily diverted in both directions via Green Lane, Parish Lane, Lennard Road, Newlands Park and Sydenham Road. (030424)3 April 24 (1300)10 April 24 (1800)
198Owing to water woks in Nursery Road (Thornton Heath), temporarily withdrawn between Thornton Heath Station and High Street/Nursery Road. (190324)21 March 24 (0800)12 April 24 (1700)
198Owing to track works in Dingwall Road, temporarily diverted southbound via Wellesley Road and George Street. (020424)29 March 24 (0100)25 April 24 (0500)
198Owing to a water leak in Poplar Walk (West Croydon), temporarily diverted southbound via St James's Road, Hogarth Crescent, Whitehorse Road, St James's Road, Newgate and Wellesley Road. (200424)22 April 24 (0800)10 May 24 (1500)
199Owing to capacity and drainage works in Canada Water Bus Station, temporarily revised to end journeys at Surrey Quays Station (Rotherhithe Old Road) and start from Surrey Quays Shopping Centre. (170424)2 March 24 (0500)13 April 24 (0500)
201Owing to road works in Crown Lane (Morden), temporarily revised to finish journeys in Morden station forecourt. [POSTPONED] (110823)  
201Owing to gas works in London Road (Mitcham), temporarily diverted towards Herne Hill via Raleigh Gardens, Upper Green West, Upper Green East, Commonside East, Cedars Avenue, Tamworth Lane, Eastfield Road and Locks Lane. (020524)22 April 24 (0000)14 July 24 (2350)
203Owing to road works in Bell Road (Hounslow), temporarily diverted westbound via Grove Road, Staines Road and Hospital Road. (260424)15 April 24 (0800)29 April 24 (1400)
205Owing to a gas leak in Chapel Street (Marylebone), temporarily diverted eastbound via Edgware Road, Harrow Road (double run to Bishop's Bridge Road) and Marylebone Road. (170424)15 April 24 (1200)20 April 24 (1200)
208Owing to water works in Widmore Road (Bromley), temporarily diverted northbound via Tweedy Road (not serving Market Square) and southbound via East Street, West Street, College Road and Tweedy Road. (030424)3 April 24 (0800)14 April 24 (1800)
216Owing to rebuilding of Cromwell Road Bus Station, temporarily revised to finish journeys at Kingston Church and start from Kingston Station. (120324)28 August 23 (1000)31 October 24 (2359)
216Owing to road works on Feltham Hill Road (Ashford), temporarily diverted Mon-Fri 0930-1530 in both directions via School Road and Staines Road West. (190424)2 April 24 (0700)27 April 24 (1530)
218Owing to crane operations on Victoria Road (North Acton), temporarily revised to end journeys on Horn Lane (stop O) and start from Wales Farm Road (stop C). (250424)18 April 24 (0001)24 April 24 (2000)
222Owing to a collapsed carriageway in Station Approach (West Drayton), temporarily diverted in both directions direct via High Street. (020424)12 June 22 (0900)1 October 24 (0059)
222Owing to road works in Bell Road (Hounslow), temporarily diverted westbound via Grove Road, Staines Road and Hospital Road. (260424)15 April 24 (0800)29 April 24 (1400)
225Owing to capacity and drainage works in Canada Water Bus Station, temporarily revised to end journeys at Surrey Quays Station (Rotherhithe Old Road) and start from Surrey Quays Shopping Centre. (170424)2 March 24 (0500)13 April 24 (0500)
227Owing to a gas leak in Penge High Street, temporarily diverted in both directions via Green Lane, Parish Lane, Lennard Road, Newlands Park. Sydenham Road and Westwood Hill. (030424)3 April 24 (1300)10 April 24 (1800)
227Owing to water works in Widmore Road (Bromley), temporarily diverted towards Penge via Kentish Way, Masons Hill, High Street, Elmfield Lane, Kentish Way, Tweedy Road and London Road (not serving Market Square) and towards Bromley North via East Street, West Street, College Road and Tweedy Road. (030424)3 April 24 (0800)14 April 24 (1800)
227Owing to a water leak in Beckenham Lane (Shortlands), temporarily diverted in both directions via Kentish Way, Masons Hill, Westmoreland Road, Hayes Lane and Shortlands Road. (250424)25 April 24 (0930)29 April 24 (1700)
228Owing to gas works on Malvern Road (Maida Hill), temporarily withdrawn between Elgin Avenue (stop MP) and Maida Hill departing via Elgin Avenue to Chippenham Road. (170424)15 April 24 (1300)25 April 24 (1800)
228Owing to a water leak on Ladbroke Grove, temporarily withdrawn between Ladbroke Grove Sainsbury's and Maida Hill. (030524)1 May 24 (0700)7 May 24 (1800)
229Owing to a water leak in West Street (Erith), temporarily diverted towards Thamesmead via Bronze Age Way, and towards Sidcup via Bronze Age Way and Walnut Tree Road. (260424)24 April 24 (1430)1 May 24 (1900)
234Owing to sewer works in Friern Barnet Lane, temporarily diverted towards Barnet via Friern Barnet Lane, Woodhouse Road, Kingsway, Ballards Lane and High Road. (170424)8 April 24 (1000)28 April 24 (1700)
237Owing to water works in Chiswick High Road, temporarily diverted towards White City via Great West Road, Sutton Court Road, Heathfield Terrace and Sutton Lane North. (010424)2 April 24 (0600)9 April 24 (1800)
238Owing to water works in High Street North (East Ham), temporarily diverted northbound via Barking Road and Ron Leighton Way. (140324)4 March 24 (0800)30 September 24 (1800)
246Owing to water works in Widmore Road (Bromley), temporarily diverted towards Bromley North Station direct via Tweedy Road. (030424)3 April 24 (0800)14 April 24 (1800)
247Owing to cycling works in Eastern Road (Romford), temporarily diverted towards Barkingside via South Street, Victoria Road and Mercury Gardens. (220324)19 March 24 (1000)19 April 24 (1800)
248Owing to cycling works in Eastern Road (Romford), temporarily diverted towards Romford via Victoria Road and Mercury Gardens. (220324)19 March 24 (1000)19 April 24 (1800)
248Owing to building works on Hall Lane (Upminster), temporarily diverted in both directions via Front Lane and Ingrebourne Gardens. (010424)29 March 24 (0700)14 April 24 (1900)
250Owing to a water leak in Poplar Walk (West Croydon), temporarily diverted southbound via St James's Road, Hogarth Crescent, Whitehorse Road, St James's Road, Newgate, Wellesley Road and Station Road. (200424)22 April 24 (0800)10 May 24 (1500)
252Owing to cycling works in Eastern Road (Romford), temporarily diverted towards Collier Row via Victoria Road and Mercury Gardens. (220324)19 March 24 (1000)19 April 24 (1800)
253Owing to water works in Eversholt Street (Camden), temporarily withdrawn between Mornington Crescent Station and Euston. (250424)13 November 23 (0800)30 April 24 (1800)
260Owing to cosmetic works in Church Road (Church End, Willesden), temporarily diverted on Wednesdays and Saturdays between 0600 and 1800 in both directions via High Road. (151122)16 November 22 (0600)30 November 24 (1800)
260Owing to crane operations on Victoria Road (North Acton), temporarily diverted towards White City via Portal Way. (250424)18 April 24 (0001)24 April 24 (2000)
261Owing to water works in Widmore Road (Bromley), temporarily diverted northbound direct via Tweedy Road. (030424)3 April 24 (0800)14 April 24 (1800)
264Owing to gas works in London Road (Mitcham), temporarily diverted towards Tooting via Commonside East, Cedars Avenue, Tamworth Lane, Eastfield Road and Locks Lane. (190424)22 April 24 (0000)1 May 24 (1756)
264Owing to gas works in London Road (Mitcham), temporarily diverted towards Tooting from London Road via St Marks Road (double run to roundabout), London Road, Upper Green East, Commonside East, Cedars Avenue, Tamworth Lane, Eastfield Road and Locks Lane. (030524)1 May 24 (1756)14 July 24 (2350)
266Owing to cosmetic works in Church Road (Church End, Willesden), temporarily diverted on Wednesdays and Saturdays between 0600 and 1800 in both directions via High Road. (151122)16 November 22 (0600)30 November 24 (1800)
266Owing to crane operations on Victoria Road (North Acton), temporarily diverted towards Brent Cross via Portal Way and Wales Farm Road. (250424)18 April 24 (0001)24 April 24 (2000)
267Owing to water works in Chiswick High Road, temporarily diverted towards Hammersmith via Great West Road, Sutton Court Road, Heathfield Terrace and Sutton Lane North. (010424)2 April 24 (0600)9 April 24 (1800)
269Owing to water works in Widmore Road (Bromley), temporarily diverted towards Bromley North Station direct via Tweedy Road. (030424)3 April 24 (0800)14 April 24 (1800)
270Owing to gas works in London Road (Mitcham), temporarily diverted towards Putney via Commonside East, Cedars Avenue, Tamworth Lane, Eastfield Road and Locks Lane. (030524)22 April 24 (0000)1 May 24 (1756)
270Owing to gas works in London Road (Mitcham), temporarily diverted towards Putney from London Road via St Marks Road (double run to roundabout), London Road, Upper Green East, Commonside East, Cedars Avenue, Tamworth Lane, Eastfield Road and Locks Lane. (030524)1 May 24 (1756)14 July 24 (2350)
272Owing to cosmetic works in Spencer Road (Grove Park), temporarily diverted towards Shepherd's Bush from Bolton Road via Cavendish Road, Hartington Road and Grove Park Road. (080424)22 April 24 (0730)6 May 24 (1800)
274Owing to bridge works in Baynes Street (Camden), temporarily diverted towards Lancaster Gate via St Pancras Way and Crowndale Road. (030524)30 April 24 (0800)20 May 24 (1800)
275Owing to bridge defects in Broadmead Road (Woodford), temporarily diverted in both directions via Broadmead Road (east), Chigwell Road, Southend Road, Woodford New Road and High Road Woodford Green. (120224)13 July 23 (2000)30 September 24 (2000)
280Owing to gas works in London Road (Mitcham), temporarily diverted towards Tooting via Relaigh Gardens, Upper Green West, Upper Green East, Commonside East, Cedars Avenue, Tamworth Lane, Eastfield Road and Locks Lane. (190424)22 April 24 (0000)14 July 24 (2350)
285Owing to rebuilding of Cromwell Road Bus Station, temporarily revised to finish journeys at Kingston Church and start from Kingston Station. (120324)28 August 23 (1000)31 October 24 (2359)
285Owing to utility works in Envoy Avenue (Hatton Cross), temporarily diverted towards Kingston via Eastern Perimeter Road. (300424)10 October 23 (1500)29 May 24 (2359)
289Owing to a water leak in Poplar Walk (West Croydon), temporarily diverted towards Elmers End via St James's Road, Hogarth Crescent, Whitehorse Road and St James's Road, not serving Croydon. (200424)22 April 24 (0800)10 May 24 (1500)
291Owing to water works in Timbercroft Lane (Plumstead Common), temporarily diverted towards Queen Elizabeth Hospital via Flaxton Road, Swingate Lane, King's Highway and The Slade. (020424)4 April 24 (0800)10 April 24 (1700)
293Owing to road works in Crown Lane (Morden), temporarily diverted towards Morden via Tudor Drive (double run from Hillcross Avenue roundabout), Epsom Road, Central Road, Morden Hall Road, Aberconway Road and London Road. [POSTPONED] (110823)  
294Owing to cycling works in Eastern Road (Romford), temporarily diverted towards Havering Park via Victoria Road and Mercury Gardens. (220324)19 March 24 (1000)19 April 24 (1800)
295Owing to safety issues at Ladbroke Grove bus stand, temporarily revised to start journeys from Ladbroke Grove (stop S). (010524)6 March 24 (1415)30 April 24 (1420)
295Owing to a water leak in Plough Road (Clapham Junction), temporarily diverted towards Clapham Junction via York Road and Falcon Road to finish at Falcon Grove. (040424)4 April 24 (1000)8 April 24 (1800)
296Owing to cycling works in Eastern Road (Romford), temporarily diverted towards Ilford via South Street, Victoria Road and Mercury Gardens. (220324)19 March 24 (1000)19 April 24 (1800)
300Owing to water works in High Street North (East Ham), temporarily diverted northbound via Barking Road and Ron Leighton Way. (140324)4 March 24 (0800)30 September 24 (1800)
301Owing to water works in Brampton Road (Bexleyheath), temporarily diverted towards Woolwich via Cumberland Drive, Hythe Avenue and Bedonwell Road. (050424)5 April 24 (1120)11 April 24 (1800)
304Owing to water works in High Street North (East Ham), temporarily diverted northbound via Barking Road and Ron Leighton Way. (140324)4 March 24 (0800)30 September 24 (1800)
308Owing to water works in International Way (Stratford City), temporarily diverted towards Lower Clapton via Montfichet Road and Penny Brookes Street. (020424)2 April 24 (1525)8 April 24 (1725)
314Owing to water works in Widmore Road (Bromley), temporarily diverted northbound direct via Tweedy Road. (030424)3 April 24 (0800)14 April 24 (1800)
315Owing to gas works in Bedford Hill (Balham), temporarily diverted in both directions via Tooting Bec Road and Balham High Road to start and finiah in Balham Station Road (departing via Bedford Hill (North)). (010424)2 April 24 (0900)14 April 24 (1700)
316Owing to water works on Shoot-Up Hill, temporarily diverted in both directions via Chichele Road, Walm Lane and Willesden Lane. (250424)29 April 24 (0800)4 May 24 (1800)
320Owing to water works in Widmore Road (Bromley), temporarily diverted northbound via Tweedy Road (not serving Market Square) and southbound via East Street, West Street, College Road and Tweedy Road. (030424)3 April 24 (0800)14 April 24 (1800)
321Owing to water works in Eltham Road (Kidbrooke), temporarily diverted towards Foots Cray via Sidcup Road and Westhorne Avenue. (250324)28 March 24 (2200)14 April 24 (1700)
323Owing to water works in Manor Road (West Ham), temporarily diverted in both directions via Barking Road, Ordnance Road and Star Lane. (170424)6 April 24 (0800)15 April 24 (1700)
325Owing to water works in High Street North (East Ham), temporarily diverted northbound via Barking Road and Ron Leighton Way. (140324)4 March 24 (0800)30 September 24 (1800)
325Owing to a fire at Forest Gate Police Station, temporarily diverted in both directions via Plashet Grove, Green Street and Plashet Road. (170424)10 March 24 (0900)19 April 24 (1800)
326Owing to water works on Church Road (Hendon), temporarily diverted in both directions via Brent Street and Queens Road. (040424)3 April 24 (0800)9 April 24 (1900)
328Owing to an unsafe structure over Pembroke Road (Earl's Court), temporarily diverted towards Golders Green via Warwick Road and Kensington High Street. (250424)29 April 24 (0001)18 May 24 (2359)
330Owing to water works in Silvertown Way, temporarily diverted in both directions via Canning Town Bus Station, northern exit, Canning Town roundabout (southbound) and Silvertown Way. [Diversion lifted 24/05 06:00-27/05 0:01] (260424)19 February 24 (0800)6 March 24 (1700)
330Owing to a fire at Forest Gate Police Station, temporarily diverted in both directions via Upton Lane and Plashet Road. (170424)10 March 24 (0900)19 April 24 (1800)
335Owing to road works in Tudway Road, temporarily diverted from Ryan Close via Ottley Drive to Tudway Road. (020424)2 April 24 (0800)18 November 24 (1800)
336Owing to water works in Widmore Road (Bromley), temporarily diverted northbound direct via Tweedy Road. (030424)3 April 24 (0800)14 April 24 (1800)
337Owing to facilities works in Richmond Bus Station, temporarily revised to finish journeys in Paradise Road/Church Terrace and start from George Street (?). (080424)4 March 24 (1000)8 April 24 (1420)
339Owing to water works in International Way (Stratford City), temporarily diverted towards Leytonstone via Montfichet Road and Penny Brookes Street. (020424)2 April 24 (1525)8 April 24 (1725)
343Owing to road works in Pepys Road (New Cross Gate), temporarily revised to start and finish journeys at New Cross Gate Sainsbury's operating via New Cross Road, Amersham Road (return Lewisham Way), Shardeloes Road and Vesta Road. (030524)1 May 24 (0800)10 May 24 (1800)
346Owing to building works on Hall Lane (Upminster), temporarily diverted in both directions via Avon Road, Front Lane and Ingrebourne Gardens. (010424)29 March 24 (0700)14 April 24 (1900)
347Owing to cycling works in Eastern Road (Romford), temporarily diverted towards Ockendon via South Street, Victoria Road and Mercury Gardens. (220324)19 March 24 (1000)19 April 24 (1800)
347Owing to building works on Hall Lane (Upminster), temporarily diverted in both directions via Avon Road, Front Lane and Ingrebourne Gardens. (010424)29 March 24 (0700)14 April 24 (1900)
350Owing to a collapsed carriageway in Station Approach (West Drayton), temporarily diverted in both directions direct via High Street. (020424)12 June 22 (0900)1 October 24 (0059)
352Owing to gas works in Wickham Way (Park Langley), temporarily diverted in both directions via Brabourne Rise, Hayes Lane, Scotts Lane, Oakwood Avenue and Overbury Avenue. (010424)2 April 24 (0800)14 April 24 (1700)
352Owing to water works in Widmore Road (Bromley), temporarily diverted towards Bromley North Station direct via Tweedy Road. (030424)3 April 24 (0800)14 April 24 (1800)
353Owing to an electrical fault in Hart Dyke Road (Ramsden), temporarily revised to terminate at stop D and depart via Petten Grove, Chelsfield Lane, Avalon Road, Gillmans Road and Tintagel Road. (030524)24 April 24 (1550)7 May 24 (1800)
354Owing to a gas leak in Penge High Street, temporarily diverted in both directions via Croydon Road and Penge High Street to start/finish prior to Penge Lane/Crooked Billet. (030424)3 April 24 (1300)10 April 24 (1800)
354Owing to water works in Widmore Road (Bromley), temporarily diverted towards Penge via Kentish Way, Masons Hill, High Street, Elmfield Lane, Kentish Way, Tweedy Road and London Road (not serving Market Square) and towards Bromley North via East Street, West Street, College Road and Tweedy Road. (030424)3 April 24 (0800)14 April 24 (1800)
354Owing to cosmetic works in Farnaby Road (Ravensbourne), temporarily diverted in both directions via Ravensbourne Avenue and Beckenham Lane. (170424)22 April 24 (0800)20 May 24 (1600)
354Owing to a water leak in Beckenham Lane (Shortlands), temporarily diverted in both directions via Kentish Way, Masons Hill, Westmoreland Road, Hayes Lane, Shortlands Road and Bromley Road. (250424)25 April 24 (0930)29 April 24 (1700)
355Owing to gas works in London Road (Mitcham), temporarily diverted towards Brixton via Commonside East, Cedars Avenue, Tamworth Lane, Eastfield Road and Locks Lane. (030524)22 April 24 (0000)1 May 24 (1756)
355Owing to gas works in London Road (Mitcham), temporarily diverted towards Brixton from London Road via St Marks Road (double run to roundabout), London Road, Upper Green East, Commonside East, Cedars Avenue, Tamworth Lane, Eastfield Road and Locks Lane. (030524)1 May 24 (1756)14 July 24 (2350)
358Owing to gas works in Wickham Way (Park Langley), temporarily diverted in both directions via Scotts Lane, Oakwood Avenue, Overbury Avenue and Wickham Road. (010424)2 April 24 (0800)14 April 24 (1700)
358Owing to water works in Widmore Road (Bromley), temporarily diverted northbound via Tweedy Road and London Road (not serving Market Square) and southbound via East Street, West Street, College Road and Tweedy Road. (030424)3 April 24 (0800)14 April 24 (1800)
358Owing to a water leak in Beckenham Lane (Shortlands), temporarily diverted in both directions via Westmoreland Road and Hayes Lane, not serving Bromley and Shortlands. (250424)25 April 24 (0930)29 April 24 (1700)
360Owing to experimental junction changes, temporarily diverted towards South Kensington direct from Grosvenor Road to Chelsea Bridge Road. (301223)14 April 22 (0500)28 December 24 (0000)
360Owing to electrical works in Pelham Street (South Kensington), temporarily diverted towards Albert Hall via Fulham Road, Sydney Place and Onslow Square. (190424)2 April 24 (0800)29 April 24 (1800)
365Owing to cycling works in Eastern Road (Romford), temporarily diverted towards Havering Park via Victoria Road and Mercury Gardens. (220324)19 March 24 (1000)19 April 24 (1800)
365Owing to zebra crossing installation in Rosewood Avenue (Mungo Park), temporarily diverted in both directions via Wood Lane, Upper Rainham Road, Elm Park Avenue and The Broadway (double run to Rosewood Avenue). (080424)8 April 24 (0900)19 April 24 (1700)
367Owing to track works in Dingwall Road, temporarily diverted southbound via Wellesley Road and George Street. (020424)29 March 24 (0100)25 April 24 (0500)
367Owing to water works in Widmore Road (Bromley), temporarily diverted towards Bromley North Station direct via Tweedy Road. (030424)3 April 24 (0800)14 April 24 (1800)
370Owing to cycling works in Eastern Road (Romford), temporarily diverted towards Romford from Victoria Road via South Street, Thurloe Gardens and Mercury Gardens. (220324)19 March 24 (1000)19 April 24 (1800)
372Owing to zebra crossing installation in Rosewood Avenue (Mungo Park), temporarily diverted in both directions via Wood Lane, Upper Rainham Road, Elm Park Avenue and The Broadway (double run to Rosewood Avenue). (080424)8 April 24 (0900)19 April 24 (1700)
375Owing to cycling works in Eastern Road (Romford), temporarily diverted towards Passingford Bridge via South Street, Victoria Road and Mercury Gardens. (220324)19 March 24 (1000)19 April 24 (1800)
376Owing to water works in High Street North (East Ham), temporarily diverted northbound via Barking Road and Ron Leighton Way. (140324)4 March 24 (0800)30 September 24 (1800)
381Owing to capacity and drainage works in Canada Water Bus Station, temporarily diverted in both directions direct via Surrey Quays Road. (170424)2 March 24 (0500)13 April 24 (0500)
382Owing to water works in Inverforth Road (New Southgate), temporarily diverted in both directions via Friern Barnet Road and Bowes Road. (080424)8 April 24 (0800)6 September 24 (1800)
390Owing to a water leak on Tottenham Court Road, temporarily diverted southbound via Gower Street and Grafton Way. (260424)24 April 24 (0900)30 April 24 (1800)
393Owing to a revised road layout in Newick Road and Lower Clapton Road, temporarily (?) revised to start and finish journeys in Upper Clapton Road. (080424)3 April 17 (0800)30 June 24 (2359)
393Owing to development works at Chalk Farm Morrisons, temporarily revised to start and finish journeys in Chalk Farm Road at Ferdinand Street. (060524)Ά31 July 21 (0000)31 May 24 (2359)
394Owing to building works in Wimbourne Street (Hoxton), temporarily diverted towards Homerton via Cropley Street, Eagle Wharf Road, New North Road (northbound), Baring Street, Bridport Place, Poole Street and New North Road. (021223)4 December 23 (0800)3 June 24 (1700)
395Owing to railway works in Eastcote Lane, temporarily diverted in both directions direct via Eastcote Lane North. (300424)3 July 23 (0600)31 May 24 (2300)
404Owing to sewer works in Coulsdon Road, temporarily withdrawn between Caterham-on-the-Hill and Coulsdon Road/Lacey Drive, arriving via Coulsdon Road and departing via Coulsdon Road and Waddington Avenue. (220424)2 April 24 (0800)19 April 24 (1600)
406Owing to rebuilding of Cromwell Road Bus Station, temporarily revised to finish journeys in Eden Street and start from Cromwell Road. (120324)28 August 23 (1000)31 October 24 (2359)
410Owing to track works in Dingwall Road, temporarily diverted southbound via Wellesley Road and George Street and also via East Croydon Bus Station (stop E3). (020424)29 March 24 (0100)25 April 24 (0500)
410Owing to gas works in Davidson Road (South Norwood), temporarily diverted in both directions via Lower Addiscombe Road, St James Road, then Newgate, Wellesley Road, St James Road, Hogarth Crescent (return Whitehorse Road and St James Road), Whitehorse Road, Northcote Road and Selhurst Road. (170424)2 April 24 (0000)10 April 24 (1800)
411Owing to rebuilding of Cromwell Road Bus Station, temporarily revised to finish journeys at Kingston Church and start from Kingston Station. (120324)28 August 23 (1000)31 October 24 (2359)
413Owing to road works in Crown Lane (Morden), temporarily diverted towards Morden via Links Avenue, Hillcross Avenue, Tudor Drive, Epsom Road, Central Road, Morden Hall Road, Aberconway Road and London Road. [POSTPONED] (110823)  
418Owing to rebuilding of Cromwell Road Bus Station, temporarily revised to finish journeys in Eden Street and start from Cromwell Road. (120324)28 August 23 (1000)31 October 24 (2359)
418Owing to water works in Hook Road (Epsom), temporarily diverted in both directions via High Street, East Street, Epsom Road, Ewell by-Pass, Epsom Road, High Street, Spring Street and Chessington Road. (010424)2 April 24 (0800)10 April 24 (1800)
423Owing to utility works in Envoy Avenue (Hatton Cross), temporarily diverted towards Hounslow via Eastern Perimeter Road. (300424)10 October 23 (1500)29 May 24 (2359)
425Owing to a fire at Forest Gate Police Station, temporarily diverted in both directions via Forest Drive, Aldersbrook Road, Centre Road and Woodgrange Road. (170424)10 March 24 (0900)19 April 24 (1800)
440Owing to electrical works on North Acton Road (Park Royal), temporarily diverted towards Turnham Green via Park Royal Road and Victoria Road. (050224)5 February 24 (0800)12 April 24 (1800)
440Owing to crane operations on Victoria Road (North Acton), temporarily diverted towards Wembley direct via Victoria Road. (250424)18 April 24 (0001)24 April 24 (2000)
450Owing to a water leak In Cheving Road (Norwood), temporarily diverted in both directions via Hermitage Road and Eversley Road. (220424)22 April 24 (0000)25 April 24 (2000)
452Owing to road layout changes at Kensal Rise bus stand, temporarily (?) withdrawn between Kensal Rise and Labroke Grove Sainsbury's. (300424)12 October 22 (0400)31 July 24 (0200)
452Owing to utility works in Sloane Street, temporarily diverted northbound via Sloane Square, Cliveden Place, Eaton Gate, Eaton Square, Hobart Place, Grosvenor Place and Knightsbridge. (080124)7 January 23 (2100)29 November 24 (1800)
453Owing to a gas leak on Cockspur Street (Trafalgar Square), temporarily diverted northbound via Trafalgar Square (East), St Martin's Place, Charing Cross Road, Shaftesbury Avenue, Grest Windmill Street, Haymarket and Charles II Street. (300424)1 May 24 (1000)5 May 24 (1800)
464Owing to water works in Ship Hill (Tatsfield), temporarily withdrawn between Tatsfield and Biggin Hill. Buses start and finish in Kings Road, arriving via Norheads Lane and departing via Rose Hill Road. A shuttle bus will operate between Tatsfield and Biggin Hill, diverting via Tatsfield Approach Road, Clark's Lane and Church Hill, operated by Go-Coach. (040224)29 January 24 (0500)29 April 24 (1600)
465Owing to rebuilding of Cromwell Road Bus Station, temporarily revised to finish journeys in Eden Street and start from Cromwell Road. (120324)28 August 23 (1000)31 October 24 (2359)
466Owing to sewer works in Coulsdon Road, temporarily revised to operate a split service with 2 buses in 3 terminating at Old Coulsdon Tudor Rose and 1 in 3 running in both directions via Coulsdon Road (towards Caterham-on-the-Hill), Chaldon Road, Rook Lane, Dean Lane, Alderstead Lane, Shepherd's Hill, London Road North, Brighton Road, Farthing Way and Brighton Road. (220424)2 April 24 (0800)19 April 24 (1600)
467Temporarily (?) revised to start journeys from Waterloo Road departing to High Street. School journeys from Epsom Hospital operate via West Hill, Station Approach and Waterloo Road. (080424)11 October 21 (0000)1 July 24 (0000)
469Owing to a water leak in West Street (Erith), temporarily diverted towards Queen Elizabeth Hospital via Bronze Age Way, and towards Bexleyheath via Bronze Age Way and Walnut Tree Road. (260424)24 April 24 (1430)1 May 24 (1900)
474Owing to incomplete line markings in Beckton bus station, temporarily diverted towards Canning Town direct via Woolwich Manor Way. (210224)25 August 23 (0000)1 January 25 (0000)
474Owing to water works in Silvertown Way, temporarily diverted in both directions via Canning Town Bus Station, northern exit, Canning Town roundabout (southbound) and Silvertown Way. [Diversion lifted 24/05 06:00-27/05 0:01] (260424)19 February 24 (0800)6 March 24 (1700)
474Owing to water works in High Street North (East Ham), temporarily diverted northbound via Barking Road and Ron Leighton Way. (140324)4 March 24 (0800)30 September 24 (1800)
476Owing to telecommunications works in Albion Road (Stoke Newington), temporarily diverted in both directions via Stoke Newington Church Street (west) and Green Lanes. (200424)22 April 24 (0800)3 May 24 (1800)
481Owing to rebuilding of Cromwell Road Bus Station, temporarily revised to finish journeys at Kingston Church and start from Kingston Station. (120324)28 August 23 (1000)31 October 24 (2359)
487Owing to crane operations on Victoria Road (North Acton), temporarily diverted towards South Harrow via Portal Way. (250424)18 April 24 (0001)24 April 24 (2000)
492Owing to water works in Station Road (Crayford), temporarily diverted in both directions via North Road, Princes Road and Crayford Road. (260424)26 April 24 (1600)29 April 24 (1700)
496Owing to cycling works in Eastern Road (Romford), temporarily diverted towards Queens Hospital from Victoria Road via South Street, Thurloe Gardens and Mercury Gardens. (220324)19 March 24 (1000)19 April 24 (1800)
496Owing to gas works on Upper Brentwood Road (Gidea Park), temporarily diverted towards Queens Hospital via Southend Arterial Road, Ardleigh Green Road and Squirrels Heath Lane. (180424)27 March 24 (0800)24 April 24 (1900)
498Owing to cycling works in Eastern Road (Romford), temporarily diverted towards Brentwood via Victoria Road and Mercury Gardens. (220324)19 March 24 (1000)19 April 24 (1800)
499Owing to cycling works in Eastern Road (Romford), temporarily diverted towards Gallows Corner via Victoria Road and Mercury Gardens. (220324)19 March 24 (1000)19 April 24 (1800)
602Owing to a water leak in West Street (Erith), temporarily diverted towards Townley School via Bronze Age Way, and towards Bexleyheath via Bronze Age Way and Walnut Tree Road. (260424)24 April 24 (1430)1 May 24 (1900)
624Owing to a water leak in Court Road (Mottingham), temporarily diverted in both directions via Eltham Hill, Westhorne Avenue and Sidcup Road. (010524)25 April 24 (1000)7 May 24 (1800)
632Owing to water works on Shoot-Up Hill, temporarily diverted in both directions via Chichele Road, Walm Lane and Willesden Lane. (250424)29 April 24 (0800)4 May 24 (1800)
643Owing to water works on Church Road (Hendon), temporarily diverted in both directions via Brent Street and Queens Road. (040424)3 April 24 (0800)9 April 24 (1900)
649Owing to cycling works in Eastern Road (Romford), temporarily diverted towards Romford from Victoria Road via South Street, Thurloe Gardens and Mercury Gardens. (220324)19 March 24 (1000)19 April 24 (1800)
650Owing to cycling works in Eastern Road (Romford), temporarily diverted towards Romford from Victoria Road via South Street, Thurloe Gardens and Mercury Gardens. (220324)19 March 24 (1000)19 April 24 (1800)
651Owing to cycling works in Eastern Road (Romford), temporarily diverted towards Chase Cross via South Street, Victoria Road and Mercury Gardens. (220324)19 March 24 (1000)19 April 24 (1800)
653Owing to water works on Church Road (Hendon), temporarily diverted in both directions via Brent Street, Queens Road and Vivian Avenue. (040424)3 April 24 (0800)9 April 24 (1900)
669Owing to a water leak in West Street (Erith), temporarily diverted towards Cleeve Park School via Bronze Age Way, and towards Bexleyheath via Bronze Age Way and Walnut Tree Road. (260424)24 April 24 (1430)1 May 24 (1900)
674Owing to cycling works in Eastern Road (Romford), temporarily diverted towards Harold Hill via South Street, Victoria Road and Mercury Gardens. (220324)19 March 24 (1000)19 April 24 (1800)
674Owing to gas works on Upper Brentwood Road (Gidea Park), temporarily diverted towards Romford via Southend Arterial Road, Ardleigh Green Road and Squirrels Heath Lane. (180424)27 March 24 (0800)24 April 24 (1900)
675Owing to bridge defects in Broadmead Road (Woodford), temporarily diverted in both directions via Broadmead Road (east), Chigwell Road, Southend Roasd, Woodford New Road and High Road Woodford Green. (120224)13 July 23 (2000)30 September 24 (2000)
683Owing to water works on Church Road (Hendon), temporarily diverted in both directions via Brent Street, Queens Road and Vivian Avenue. (040424)3 April 24 (0800)9 April 24 (1900)
686Owing to cycling works in Eastern Road (Romford), temporarily diverted towards St Edward's School via South Street, Victoria Road and Mercury Gardens. (220324)19 March 24 (1000)19 April 24 (1800)
698Owing to a collapsed carriageway in Station Approach (West Drayton), temporarily revised to start and finish journeys in Station Road. (020424)12 June 22 (0900)1 October 24 (0059)
B11Owing to water works in Brampton Road (Bexleyheath), temporarily diverted towards Thamsmead via Cumberland Drive, Hythe Avenue and Bedonwell Road. (050424)5 April 24 (1120)11 April 24 (1800)
B13Owing to a gas leak in Days Lane (Blackfen), temporarily diverted in both directions via Halfway Street, Willersley Avenue and The Oval. (260424)22 April 24 (1745)29 April 24 (1800)
B15Owing to gas works in Holmesdale Road (Bexleyheath), temporarily diverted in both directions via brampton Road, Fairlawn Avenue (return Normanhurst Avenue) and Gipsy Road. [CANCELLED] (260124)  
B16Owing to water works in Eltham Road (Kidbrooke), temporarily diverted towards Bexleyheath via Sidcup Road and Westhorne Avenue. (250324)28 March 24 (2200)14 April 24 (1700)
B16Owing to road works in Tudway Road, temporarily diverted from Ryan Close via Ottley Drive to Tudway Road. (020424)2 April 24 (0800)18 November 24 (1800)
C1Owing to utility works in Sloane Street, temporarily diverted towards White City via Eaton Square, Belgrave Place, Chesham Place, Pont Street and Beauchamp Place. (080124)16 February 23 (0300)29 November 24 (1800)
C1Owing to cosmetic works in Elizabeth Street (Belgravia), temporarily diverted towards White City via Ebury Street and Eccleston Street. (010424)29 March 24 (0800)30 April 24 (1800)
C1Owing to an unsafe structure over Pembroke Road (Earl's Court), temporarily diverted towards White City via Warwick Road. (250424)29 April 24 (0001)18 May 24 (2359)
C1Owing to water works in Ebury Street (Belgravia), temporarily diverted towards White City via Buckingham Palace Road, Pimlico Road, Lower Sloane Street, Sloane Square, Cliveden Place and Eaton Square to rejoin above diversion. (190424)22 April 24 (0800)26 April 24 (1700)
C3Owing to a water leak in Plough Road (Clapham Junction), temporarily diverted towards Clapham Junction via York Road and Falcon Road to finish at Falcon Grove. (040424)4 April 24 (1000)8 April 24 (1800)
C3Owing to an unsafe structure over Pembroke Road (Earl's Court), temporarily revised to start and finish journeys in West Cromwell Road (stop D). (250424)29 April 24 (0001)18 May 24 (2359)
C10Owing to capacity and drainage works in Canada Water Bus Station, temporarily revised to end journeys at Surrey Quays Leisure Park and start from Surrey Quays Road/Canada Street depating via Surrey Quays Road, Lower Road and Redriff Road. (170424)2 March 24 (0500)13 April 24 (0500)
D3Owing to water works in Cable Street (Shadwell), temporarily diverted towards Bethnal Green via The Highway, Butcher Row, Commercial Road and Sutton Street. (300424)1 May 24 (0900)3 May 24 (2300)
E6Owing to gas works in Oldfield Lane North, temporarily withdrawn between Greenford Broadway and Greenford Station. (030324)3 March 24 (1900)12 May 24 (2000)
E8Owing to road works in Bell Road (Hounslow), temporarily revised to end journeys in Grove Road. (260424)15 April 24 (0800)29 April 24 (1400)
EL1Owing to gas works in Movers Lane (Barking), temporarily diverted towards Ilford via Alfreds Way and Ripple Road. (020424)2 April 24 (0800)21 April 24 (1900)
EL2Owing to gas works in Movers Lane (Barking), temporarily diverted towards Becontree Heath via Alfreds Way and Ripple Road. (020424)2 April 24 (0800)21 April 24 (1900)
EL3Owing to gas works in Movers Lane (Barking), temporarily diverted towards Little Heath via Alfreds Way and Ripple Road. (020424)2 April 24 (0800)21 April 24 (1900)
G1Owing to a water leak in Sabine Road (Battersea), tempoarily withdrawn between Clapham Junction and Battersea, starting and finishing in Falcon Road. (250424)24 April 24 (1200)30 April 24 (1800)
H20Owing to road works in Bell Road (Hounslow), temporarily revised to start and end journeys in Grove Road near Bell Road. (260424)15 April 24 (0800)29 April 24 (1400)
H22Owing to road works in Bell Road (Hounslow), temporarily revised to end journeys in Grove Road. (260424)15 April 24 (0800)29 April 24 (1400)
H32Owing to road works in Bell Road (Hounslow), temporarily diverted westbound via Grove Road, Staines Road and Hospital Road. (260424)15 April 24 (0800)29 April 24 (1400)
H37Owing to bridge works at Manor Circus, temporarily withdrawn between Richmond Station and Manor Circus. (020424)27 November 23 (1500)11 April 24 (0500)
H91Owing to water works in Chiswick High Road, temporarily diverted towards Hammersmith via Great West Road, Sutton Court Road, Heathfield Terrace and Sutton Lane North. (010424)2 April 24 (0600)9 April 24 (1800)
H98Owing to road works in Bell Road (Hounslow), temporarily diverted westbound via Grove Road, Staines Road and Hospital Road. (260424)15 April 24 (0800)29 April 24 (1400)
K1Owing to rebuilding of Cromwell Road Bus Station, temporarily revised to start and finish journeys in Eden Street. (120324)28 August 23 (1000)31 October 24 (2359)
K1Owing to sewer works in Lingfield Avenue (Surbiton), temporarily diverted in both directions via St Mark's Hill, Lambert Road and Villers Avenue. (080424)2 April 24 (0800)8 April 24 (1500)
P4Owing to safety issues in Honor Oak Park, temporarily diverted towards Lewisham via Honor Oak Park (east), Brockley Rise and Stondon Park (south). (260124)28 May 22 (0000)31 December 24 (2359)
P12Owing to capacity and drainage works in Canada Water Bus Station, temporarily towards Surrey Quays direct via Lower Road and towards Brockley Rise direct via Surrey Quays Road. (170424)2 March 24 (0500)13 April 24 (0500)
P12Owing to a water leak in Ivydale Road (Nunhead), temporarily diverted in both directions via Brockley Way, St Norbert Road, Frendsbury Road, Avignon Road and St Asaph Road. (010524)1 May 24 (0200)7 May 24 (1700)
R4Owing to gas works in Starts Hill Road, temporarily diverted in both directions via Farnborough Common. (020424)4 April 24 (0800)13 June 24 (1800)
R5Owing to gas works in Cudham Lane North, temporarily diverted between Knockholt Pound and Green Street Green via Pratt's Bottom (R10 route) not serving Cudham area. Buses start and finish at Three Horseshoes. (010524)2 April 24 (0800)3 May 24 (1700)
R5Owing to a water leak in Cudham Lane North, temporarily diverted between Knockholt Pound and Green Street Green via Pratt's Bottom (R10 route) not serving Cudham area. Buses start and finish at Three Horseshoes. (030524)7 May 24 (0900)12 May 24 (1600)
R6Owing to water works in Station Road (St Mary Cray), temporarily diverted in both directions via Cray Avenue, Kent Road, High Street and Mill Brook Road. (020424)8 April 24 (0800)10 April 24 (2000)
R7Owing to cosmetic works in Loop Road (Chislehurst), temporarily diverted towards Chelsfield via Heathfield Lane, Centre Common Road and Bromley Road. (300424)2 April 24 (0800)2 May 24 (1600)
R10Owing to gas works in Cudham Lane North, temporarily diverted between Knockholt Pound and Green Street Green via Pratt's Bottom (R5 route) not serving Cudham area. Buses start and finish at Three Horseshoes. (010524)2 April 24 (0800)3 May 24 (1700)
R10Owing to a water leak in Cudham Lane North, temporarily diverted between Knockholt Pound and Green Street Green via Pratt's Bottom (R5 route) not serving Cudham area. Buses start and finish at Three Horseshoes. (030524)7 May 24 (0900)12 May 24 (1600)
R68Owing to water works in Station Yard (Twickenham), temporarily revised to start journeys from London Road (TBC) instead of York Street. (030124)3 January 24 (0800)21 June 24 (1800)
S1Owing to gas works in London Road (Mitcham), temporarily diverted towards Lavender Fields via Raleigh Gardens, Upper Green West, Upper Green East, Commonside East, Cedars Avenue, Tamworth Lane, Eastfield Road and Locks Lane. (190424)22 April 24 (0000)14 July 24 (2350)
S1Owing to gas works in Erksine Road (Sutton), temporarily diverted in both directions via Thicket Road, Lower Road, Westmead Road, Colston Avenue, West Street and Wrythe Lane (250424)24 April 24 (1310)16 June 24 (1700)
S4Owing to gas works in Stanley Road (Wallington), temporarily diverted in both directions direct via Stanley Park Road between the junctions with Stanley Road and Queen Mary's Road. (270324)27 March 24 (1250)8 May 24 (1800)
SL3Owing to electrical works in Bexleyheath Broadway, temporarily revised towards Bromley to stop at Upton Road instead of Lion Road. (010424)29 March 24 (0800)16 April 24 (1700)
SL3Owing to crash barrier works in East Rochester Way, temporarily diverted towards Thamesmead via Blendon Road, Bridgen Road and Arbuthnot Lane. (170424)2 April 24 (0500)19 April 24 (2200)
SL3Owing to water works in Widmore Road (Bromley), temporarily diverted towards Bromley North Station direct via Tweedy Road. (030424)3 April 24 (0800)14 April 24 (1800)
SL3Owing to water works in Brampton Road (Bexleyheath), temporarily diverted towards Thamsmead via Cumberland Drive, Hythe Avenue and Bedonwell Road. (050424)5 April 24 (1120)11 April 24 (1800)
SL5Owing to gas works in Wickham Way (Park Langley), temporarily diverted in both directions via Scotts Lane, Oakwood Avenue, Overbury Avenue and Wickham Road. At Park Langley, buses stop in South Eden Park Road towards Croydon and Wickham Road towards Bromley. (010424)2 April 24 (0800)14 April 24 (1700)
SL7Owing to utility works in Envoy Avenue (Hatton Cross), temporarily diverted towards Croydon via Eastern Perimeter Road. (300424)10 October 23 (1500)29 May 24 (2359)
SL7Owing to track works in Dingwall Road, temporarily diverted towards Heathrow via Wellesley Road, George Street, East Croydon Bus Station (stop E2), Addiscombe Road, Addiscombe Grove, Fairfield Road and Barclay Road. (020424)29 March 24 (0100)25 April 24 (0500)
U1Owing to a collapsed carriageway in Station Approach (West Drayton), temporarily revised to start and finish journeys in Station Road via High Street. (020424)12 June 22 (0900)1 October 24 (0059)
U3Owing to a collapsed carriageway in Station Approach (West Drayton), temporarily diverted in both directions direct via High Street. (020424)12 June 22 (0900)1 October 24 (0059)
U5Owing to a collapsed carriageway in Station Approach (West Drayton), temporarily diverted in both directions direct via High Street. (020424)12 June 22 (0900)1 October 24 (0059)
U5Owing to telecommunications works on Stockley Road and Lavender Rise (Stockley Estate), temporarily diverted towards Hayes via Station Road, Sipson Road, Cherry Lane and Stockley Road. (170424)18 April 24 (0800)20 April 24 (0800)
U5Owing to telecommunications works on Stockley Road and Lavender Rise (Stockley Estate), temporarily diverted in both directions via Station Road, Sipson Road, Cherry Lane and Stockley Road. (300424)20 April 24 (0800)29 April 24 (1600)
W3Owing to water works in Priory Road (Hornsey), temporarily diverted towards Northumberland Park via High Street Hornsey, Turnpike Lane and High Road Wood Green. (170424)9 April 24 (0800)21 April 24 (1800)
N3Owing to gas works in Wickham Way (Park Langley), temporarily diverted in both directions via Shortlands Road and Bromley Road. (010424)2 April 24 (0800)14 April 24 (1700)
N3Owing to water works in Widmore Road (Bromley), temporarily diverted towards Bromley North Station direct via Tweedy Road. (030424)3 April 24 (0800)14 April 24 (1800)
N3Owing to a gas leak on Cockspur Street (Trafalgar Square), temporarily diverted northbound via Trafalgar Square (East), St Martin's Place, Charing Cross Road, Shaftesbury Avenue, Grest Windmill Street, Haymarket and Charles II Street. (300424)1 May 24 (1000)5 May 24 (1800)
N5Owing to water works in Eversholt Street (Camden), temporarily diverted towards Trafalgar Square via Milbrook Place, Harrington Square, Lidlington Place and Hampstead Road. (250424)13 November 23 (0800)30 April 24 (1800)
N5Owing to a gas leak on Eversholt Street (Euston), temporarily diverted towards Edgware via Hampstead Road, not serving Euston. (170424)9 April 24 (1200)19 April 24 (1800)
N5Owing to a water leak on Tottenham Court Road, temporarily diverted southbound via Euston Road slip road, Gower Street and Grafton Way. (260424)24 April 24 (0900)30 April 24 (1800)
N8Owing to building works in Angel Street, temporarily diverted towards Hainault via King Edward Street, Little Britain, Montague Street and Aldersgate Street. (090223)12 June 23 (1200)31 March 25 (1800)
N9Owing to water works in Chiswick High Road, temporarily diverted towards Aldwych via Great West Road, Sutton Court Road, Heathfield Terrace and Sutton Lane North. (010424)2 April 24 (0600)9 April 24 (1800)
N9Owing to road works in Bell Road (Hounslow), temporarily diverted westbound via Grove Road, Staines Road and Hospital Road. (260424)15 April 24 (0800)29 April 24 (1400)
N9Owing to a gas leak on Cockspur Street (Trafalgar Square), temporarily diverted westbound via Trafalgar Square (East), St Martin's Place, Charing Cross Road, Shaftesbury Avenue, Grest Windmill Street, Haymarket and Charles II Street. (300424)1 May 24 (1000)5 May 24 (1800)
N15Owing to poor road design, temporarily (?) diverted towards Romford via Goodman's Yard and Mansell Street, instead of Minories, Aldgate Bus Station and Aldgate High Street. (080424)4 May 16 (1500)1 July 24 (0000)
N15Owing to cycling works in Eastern Road (Romford), temporarily diverted towards Harold Hill via Victoria Road and Mercury Gardens. (220324)19 March 24 (1000)19 April 24 (1800)
N15Owing to a gas leak on Cockspur Street (Trafalgar Square), temporarily diverted northbound via Trafalgar Square (East), St Martin's Place, Charing Cross Road, Shaftesbury Avenue, Grest Windmill Street, Haymarket and Charles II Street. (300424)1 May 24 (1000)5 May 24 (1800)
N16Owing to water works on Shoot-Up Hill, temporarily diverted in both directions via Chichele Road, Walm Lane and Willesden Lane. (250424)29 April 24 (0800)4 May 24 (1800)
N18Owing to a gas leak on Cockspur Street (Trafalgar Square), temporarily withdrawn between Piccadilly Circus and Trafalgar Square. (300424)1 May 24 (1000)5 May 24 (1800)
N19Owing to utility works in Sloane Street, temporarily diverted northbound via Sloane Square, Cliveden Place, Eaton Gate, Eaton Square, Hobart Place and Grosvenor Place. (080124)7 January 23 (2100)29 November 24 (1800)
N20Owing to water works in Eversholt Street (Camden), temporarily diverted towards Trafalgar Square via Milbrook Place, Harrington Square, Lidlington Place and Hampstead Road. (250424)13 November 23 (0800)30 April 24 (1800)
N20Owing to a gas leak on Eversholt Street (Euston), temporarily diverted towards Barnet via Hampstead Road, not serving Euston. (170424)9 April 24 (1200)19 April 24 (1800)
N20Owing to a water leak on Tottenham Court Road, temporarily diverted southbound via Euston Road slip road, Gower Street and Grafton Way. (260424)24 April 24 (0900)30 April 24 (1800)
N21Owing to water works in Eltham Road (Kidbrooke), temporarily diverted towards Bexleyheath via Sidcup Road and Westhorne Avenue. (250324)28 March 24 (2200)14 April 24 (1700)
N22Owing to utility works in Sloane Street, temporarily diverted northbound via Sloane Square, Cliveden Place, Eaton Gate, Eaton Square, Hobart Place and Grosvenor Place. (080124)7 January 23 (2100)29 November 24 (1800)
N22Owing to telecommunications works in Piccadilly, temporarily diverted towards Putney Common via Regent Street, Piccadilly Circus, Haymarket, Charles II Street, Regent Street and Piccadilly. (030524)6 May 24 (0800)9 May 24 (1800)
N25Owing to building works in Angel Street, temporarily diverted towards Ilford via King Edward Street, Little Britain, Montague Street and Aldersgate Street. (140223)12 June 23 (1200)31 March 25 (1800)
N25Owing to a fire at Forest Gate Police Station, temporarily diverted in both directions via Forest Drive, Aldersbrook Road, Centre Road and Woodgrange Road. (170424)10 March 24 (0900)19 April 24 (1800)
N25Owing to gas works in Leadenhall Street (City), temporarily diverted westbound via Middlesex Street, St Botolph Street, Dukes Place, Bevis Marks, Camomile Street and Bishopgate, and eastbound via Lombard Street, King William Street, Gracechurch Street and Fenchurch Street. (080424)8 April 24 (0700)20 May 24 (2000)
N26Temporarily revised to finish journeys in Victoria at Westminster Cathedral, instead of Terminus Place. (120424)29 July 23 (0800)1 June 24 (0000)
N27Owing to development works at Chalk Farm Morrisons, temporarily revised to start and finish journeys in Chalk Farm Road at Harmood Street. (060524)Ά10 July 21 (0000)31 May 24 (2359)
N27Owing to a gas leak in Chapel Street (Marylebone), temporarily diverted eastbound via Edgware Road, Harrow Road (double run to Bishop's Bridge Road) and Marylebone Road. (170424)15 April 24 (1200)20 April 24 (1200)
N27Owing to an electrica fault in Hampstead Road (Mornington Crescent), temporarily diverted southbound via Eversholt Street, Lidlington Place and Harrington Square. (250424)17 April 24 (1500)8 May 24 (1800)
N29Owing to an electrica fault in Hampstead Road (Mornington Crescent), temporarily diverted southbound via Eversholt Street, Lidlington Place and Harrington Square. (250424)17 April 24 (1500)8 May 24 (1800)
N29Owing to a water leak on Tottenham Court Road, temporarily diverted southbound via Euston Road slip road, Gower Street and Grafton Way. (260424)24 April 24 (0900)30 April 24 (1800)
N31Owing to an unsafe structure over Pembroke Road (Earl's Court), temporarily diverted towards Camden Town via Warwick Road and Kensington High Street. (250424)29 April 24 (0001)18 May 24 (2359)
N32Owing to water works on Shoot-Up Hill, temporarily diverted in both directions via Chichele Road, Walm Lane and Willesden Lane. (260424)29 April 24 (0800)4 May 24 (1800)
N44Owing to gas works in London Road (Mitcham), temporarily diverted towards Aldwych via Raleigh Gardens, Upper Green West, Upper Green East, Commonside East, Cedars Avenue, Tamworth Lane, Eastfield Road and Locks Lane. (190424)22 April 24 (0000)14 July 24 (2350)
N68Owing to building works, temporarily (?) revised to finish journeys in St Giles High Street at Shaftesbury Avenue. (080424)2 December 15 (0430)1 July 24 (0600)
N68Owing to track works in Dingwall Road, temporarily diverted southbound via Wellesley Road, George Street, East Croydon Bus Station (stop E2) and George Street. (020424)29 March 24 (0100)25 April 24 (0500)
N73Owing to telecommunications works in Albion Road (Stoke Newington), temporarily diverted in both directions via Stoke Newington Church Street (west) and Green Lanes. (200424)22 April 24 (0800)3 May 24 (1800)
N73Owing to a water leak on Tottenham Court Road, temporarily diverted southbound via Gower Street and Grafton Way. (260424)24 April 24 (0900)30 April 24 (1800)
N86Owing to a fire at Forest Gate Police Station, temporarily diverted in both directions via Forest Drive, Aldersbrook Road, Centre Road and Woodgrange Road. (170424)10 March 24 (0900)19 April 24 (1800)
N86Owing to cycling works in Eastern Road (Romford), temporarily diverted towards Oxford Circus via South Street, Victoria Road and Mercury Gardens. (220324)19 March 24 (1000)19 April 24 (1800)
N97Owing to a gas leak on Cockspur Street (Trafalgar Square), temporarily withdrawn between Piccadilly Circus and Trafalgar Square. (300424)1 May 24 (1000)5 May 24 (1800)
N98Owing to cycling works in Procter Street, temporarily revised to end journeys in Bloomsbury Way and start from New Oxford Street. (030524)18 January 24 (1700)31 May 24 (1700)
N109Owing to a water leak in Poplar Walk (West Croydon), temporarily diverted southbound via St James's Road, Hogarth Crescent, Whitehorse Road, St James's Road, Newgate and Wellesley Road. (200424)22 April 24 (0800)10 May 24 (1500)
N109Owing to a gas leak on Cockspur Street (Trafalgar Square), temporarily diverted northbound via Trafalgar Square (East), St Martin's Place, Charing Cross Road, Shaftesbury Avenue, Grest Windmill Street, Haymarket and Charles II Street. (300424)1 May 24 (1000)5 May 24 (1800)
N113Owing to a gas leak on Cockspur Street (Trafalgar Square), temporarily withdrawn between Piccadilly Circus and Trafalgar Square. (300424)1 May 24 (1000)5 May 24 (1800)
N136Owing to a gas leak on Cockspur Street (Trafalgar Square), temporarily diverted northbound via Trafalgar Square (East), St Martin's Place, Charing Cross Road, Shaftesbury Avenue, Grest Windmill Street, Haymarket and Charles II Street. (300424)1 May 24 (1000)5 May 24 (1800)
N137Owing to utility works in Sloane Street, temporarily diverted northbound via Sloane Square, Cliveden Place, Eaton Gate, Eaton Square, Hobart Place and Grosvenor Place. (080124)7 January 23 (2100)29 November 24 (1800)
N199Owing to capacity and drainage works in Canada Water Bus Station, temporarily towards in both directions direct via Lower Road. (170424)2 March 24 (0500)13 April 24 (0500)
N199Owing to water works in Widmore Road (Bromley), temporarily diverted northbound via Tweedy Road (not serving Market Square) and southbound via East Street, West Street, College Road and Tweedy Road. (030424)3 April 24 (0800)14 April 24 (1800)
N205Owing to water works in International Way (Stratford City), temporarily diverted towards Leyton via Montfichet Road and Penny Brookes Street. (020424)2 April 24 (1525)8 April 24 (1725)
N205Owing to a gas leak in Chapel Street (Marylebone), temporarily diverted eastbound via Edgware Road, Harrow Road (double run to Bishop's Bridge Road) and Marylebone Road. (170424)15 April 24 (1200)20 April 24 (1200)
N207Owing to cycling works in Procter Street, temporarily revised to end journeys in Bloomsbury Way and start from New Oxford Street. (030524)18 January 24 (1700)31 May 24 (1700)
N242Owing to building works in Angel Street, temporarily diverted towards Homerton via King Edward Street, Little Britain, Montague Street and Aldersgate Street. (090223)12 June 23 (1200)31 March 25 (1800)
N250Owing to track works in Dingwall Road, temporarily diverted southbound via Wellesley Road, George Street, East Croydon Bus Station (stop E2) and George Street. (020424)29 March 24 (0100)25 April 24 (0500)
N250Owing to a water leak in Poplar Walk (West Croydon), temporarily diverted southbound via St James's Road, Hogarth Crescent, Whitehorse Road, St James's Road, Newgate, Wellesley Road and Station Road. (200424)22 April 24 (0800)10 May 24 (1500)
N253Owing to water works in Eversholt Street (Camden), temporarily diverted towards Tottenham Court Road Station via Milbrook Place, Harrington Square, Lidlington Place and Hampstead Road, and towards Aldgate via Lidlington Place and Hampstead Road. (170424)13 November 23 (0800)24 April 24 (1830)
N253Owing to a gas leak on Eversholt Street (Euston), temporarily diverted towards Aldgate via Hampstead Road, not serving Euston. (170424)9 April 24 (1200)19 April 24 (1800)
N253Owing to water works in Eversholt Street (Camden), temporarily diverted towards Tottenham Court Road Station via Milbrook Place, Harrington Square, Lidlington Place and Hampstead Road. (250424)24 April 24 (1830)30 April 24 (1800)
N253Owing to a water leak on Tottenham Court Road, temporarily diverted southbound via Euston Road slip road, Gower Street and Grafton Way. (260424)24 April 24 (0900)30 April 24 (1800)
N266Owing to cosmetic works in Church Road (Church End, Willesden), temporarily diverted on Wednesdays and Saturdays between 0600 and 1800 in both directions via High Road. (151122)16 November 22 (0600)30 November 24 (1800)
N266Owing to crane operations on Victoria Road (North Acton), temporarily diverted towards Brent Cross via Portal Way and Wales Farm Road. (250424)18 April 24 (0001)24 April 24 (2000)
N279Owing to an electrica fault in Hampstead Road (Mornington Crescent), temporarily diverted southbound via Eversholt Street, Lidlington Place and Harrington Square. (250424)17 April 24 (1500)8 May 24 (1800)
N279Owing to a water leak on Tottenham Court Road, temporarily diverted southbound via Euston Road slip road, Gower Street and Grafton Way. (260424)24 April 24 (0900)30 April 24 (1800)
N343Owing to road works in Pepys Road (New Cross Gate), temporarily revised to start and finish journeys at New Cross Gate Sainsbury's operating via New Cross Road, Amersham Road (return Lewisham Way), Shardeloes Road and Vesta Road. (030524)1 May 24 (0800)10 May 24 (1800)
N381Owing to capacity and drainage works in Canada Water Bus Station, temporarily diverted in both directions direct via Surrey Quays Road. (170424)2 March 24 (0500)13 April 24 (0500)
N550Owing to gas works in Leadenhall Street (City), temporarily diverted westbound via Middlesex Street, St Botolph Street, Dukes Place, Bevis Marks, Camomile Street and Bishopgate, and eastbound via Lombard Street, King William Street, Gracechurch Street and Fenchurch Street. (080424)8 April 24 (0700)20 May 24 (2000)
N550Owing to a gas leak on Cockspur Street (Trafalgar Square), temporarily withdrawn between Trafalgar Square (Charing Cross Station) and Cockspur Street. (300424)1 May 24 (1000)5 May 24 (1800)
N551Owing to engineering difficulties in Camomile Street, temporarily diverted towards Gallions Reach via New Change, Cheapside, Newgate Street, King Edward Street, Montague Street, London Wall and Wormwood Street. (301223)17 July 23 (0100)31 December 24 (1800)
N551Owing to incomplete line markings in Beckton bus station, temporarily diverted towards Gallions Reach direct via Woolwich Manor Way. (210224)25 August 23 (0000)1 January 25 (0000)
N551Owing to water works in Silvertown Way, temporarily diverted in both directions via Canning Town Bus Station, northern exit, Canning Town roundabout (southbound) and Silvertown Way. [Diversion lifted 24/05 06:00-27/05 0:01] (260424)19 February 24 (0800)6 March 24 (1700)

Page generated 06/05/2024 23:55:41

Home | Timetables | Bus routes | Operational details | Service changes | Operators & Garages | Photo gallery

This space is intentionally left blank.

Page generated 06/05/2024 23:55:41

Home | Timetables | Bus routes | Operational details | Service changes | Operators & Garages | Photo gallery